From Casetext: Smarter Legal Research

Sierra Pacific Power Co. v. Hartford Steam Boiler Co.

United States District Court, D. Nevada
Nov 17, 2005
CV-N-04-0034-LRH (RAM) (D. Nev. Nov. 17, 2005)

Opinion

CV-N-04-0034-LRH (RAM).

November 17, 2005


ORDER


Presently before this Court are motions for summary judgment (# 27) and to exclude evidence submitted to oppose summary judgment (# 37) brought by Defendants. Plaintiff has opposed each motion (# 32 and 42), and Defendants have filed replies (# 36 and 43).

FACTUAL AND PROCEDURAL BACKGROUND

The present dispute arises over insurance contracts entered into to protect Plaintiff Sierra Pacific Power Company in the event that its Farad Dam, located on the Truckee River in Farad, California, was damaged. Unfortunately, a massive flood in 1997 destroyed the Farad Dam and precipitated the present chain of events leading to the present lawsuit.

After the dam was destroyed, Plaintiff began discussions with Defendants Hartford Steam Boiler Inspection and Insurance Company and Zurich American Insurance Company, each the insurer of one half of Plaintiff's interest in the dam. The discussions centered around how much Plaintiff would be entitled to under the policies involved, and what Plaintiff had to complete in order to qualify for those funds. The parties have been bickering over the interpretation, and execution, of a provision in the contracts known as a "replacement cost" provision. This provision states that "in the event of loss or damage to property which is not repaired, rebuilt or replaced within two years from the date of loss or damage, this company shall not be liable for more than the actual cash value (with proper deduction for depreciation) of the property destroyed."

Both parties agree that this clause contemplates a dual requirement for repair, rebuilding or replacement costs to be covered by the contract: first, an actual expenditure relating to repairing, rebuilding or replacing the covered property, and second, that this expenditure arise within the two year period contemplated by the contract. In this instance, however, the two year period has been extended to a seven year period through written one year extensions issued by Defendants, at Plaintiff's request, in 1998, 1999, 2000, 2001 and 2002. Under these extensions, the requirements for payment under the contracts were to be completed by December 31, 2003. This lawsuit was filed December 18, 2003 with the goal of legally determining that Plaintiff is entitled to the cost of replacing Farad Dam, as opposed to the actual cash value of the dam when destroyed by the flood.

A final point regarding the insurance contract discussions warrants mentioning. In 2001, Defendants offered, and Plaintiff accepted a payment of $1,011,000.00 on the contract. There is a present dispute between the parties whether that payment amounted to payment of the actual cash value of the property in full, or a first payment on the expenditures incurred to rebuild the dam. This dispute is irrelevant to the pending discussion, but the timing of the payment is not.

Discovery was had on the underlying issues. As a part of that discovery, Defendants conducted a Rule 30(b)(6) deposition of Ms. Jeannette Wiley. In that deposition, Defendants asked Ms. Wiley if Plaintiff had begun repairs on the Farad Dam. Ms. Wiley answered that repairs had not begun. The basis for summary judgment is Defendants' contention that this admission amounts to proof that Plaintiff has not complied with the requirement that repair, rebuilding or replacement begin within the contract term.

In Plaintiff's opposition to summary judgment, an affidavit from Ms. Wiley was attached contending that she had misunderstood the question posed to her at her deposition. Specifically, Ms. Wiley understood the question to inquire only about repairs. Since the dam is being completely rebuilt, Ms. Wiley states, she answered that no repairs had been done at this time even though she knew that actions had been taken on the dam project. Ms. Wiley also states she has reviewed the affidavit of John S. Bedrow, also attached to the opposition to summary judgment, and is able to now state that nearly four million dollars have been expended on the rebuilding project.

Defendants have objected to both these pieces of evidence, as well as a letter also attached to the opposition to summary judgment, contending first that Ms. Wiley's affidavit is a sham, offered only to create an issue of fact she herself precluded in her deposition testimony, and second that Mr. Bedrow's affidavit should be stricken under Federal Rule of Civil Procedure 37 because Mr. Bedrow was not disclosed by Plaintiff in their mandatory Rule 26(a) disclosures, or any subsequent update.

LEGAL STANDARD FOR SUMMARY JUDGMENT

A court must grant summary judgment if the pleadings and supporting documents, when viewed in the light most favorable to the non-moving party, "show that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law." Fed.R.Civ.P. 56(c). An issue as to any material fact is only "genuine" if the evidence regarding the disputed fact is "such that a reasonable jury could return a verdict for the nonmoving party." Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). "The mere existence of a scintilla of evidence in support of the plaintiff's position will be insufficient [to preclude summary judgment]; there must be evidence on which the jury could reasonably find for the plaintiff." Id.

DISCUSSION

To properly reach the summary judgment issue in this matter, the Court must first determine whether the evidence presented in opposition to summary judgment should be excluded on the grounds raised by Defendants. Once that issue is decided, the Court will turn to determine whether a genuine issue of material fact exists.

A. Summary Judgment Evidence

The Court is faced with two pieces of evidence in dispute. As a preliminary matter, though, the Court notes that Defendant's have objected to a letter allegedly written to Mr. Pat Jeremy by Mr. William E. Peterson and noting that an impasse had arisen between the parties concerning the discussions over the contract provision. The letter, as provided to the Court, is unsigned and Defendants have provided an affidavit stating that the letter was never received. The Court need not pass on the admissibility of the letter at this time, as it is irrelevant to the summary judgment issue. Thus, the Court states that it has not considered this disputed letter in any capacity when reaching its decision regarding summary judgment.

1. Affidavit of Ms. Jeanette Wiley

Defendants seek to exclude the affidavit of Ms. Wiley attached to Plaintiff's opposition to summary judgment on the sole ground that it is a sham affidavit. A sham affidavit is one introduced to contradict previous sworn deposition testimony for the sole purpose of creating a material issue of fact that would preclude summary judgment. "The general rule in the Ninth Circuit is that a party cannot create an issue of fact by an affidavit contradicting his prior deposition testimony." Kennedy v. Allied Mut. Ins. Co., 952 F.2d 262, 266 (9th Cir. 1991). The reasoning behind this rule is that the utility of the summary judgment procedure would be diminished greatly if a party who has been examined at length could simply submit an affidavit contradicting that previous testimony to create an issue of fact. Id.

However, this general rule does not apply to every situation where a subsequent affidavit contradicts prior deposition testimony. In fact, the subsequent affidavit will only be excluded by a court when there is a specific factual determination that the contradiction was actually a sham. Id. at 267. Defendants have argued that the affidavit flatly contradicts the prior testimony and must be excluded for the sole reason that a pure contradiction exists. The Court disagrees.

The Court first notes that the deposition taken did not question Ms. Wiley in depth concerning whether Plaintiff had made expenditures repairing, replacing or rebuilding Farad Dam. In fact, the testimony on which Defendants place their summary judgment hopes is a simply two question exchange:

Q: What's the status today of the repair efforts? Still pending?

A: You mean have we started?

Q: Yes.

A: No.

The Court does not find this passing reference to repair efforts to be the type of examination at length that the general sham affidavit rule is meant to protect.

Further, the Court is unconvinced that the affidavit flatly contradicts the deposition testimony. While Ms. Wiley admitted that no repair efforts were being made, there was no elaboration on whether or not expenditures had been made in any form for the rebuilding or replacement of the dam. The affidavit merely expands upon the questioning that was not provided and does not state that repairs are being made. Thus, the Court concludes that the affidavit supplements, and does not contradict, the previous deposition testimony.

Finally, the Court does not find that the affidavit is a sham. Plaintiff has provided several other pieces of evidence suggesting that the dam was being replaced and that expenditures were being made to further that project. Defendants have provided no evidence to contradict Plaintiffs averred need for the further explanation contained in the affidavit and the Court finds no indicia of deceit related to the filing of the disputed affidavit. Accordingly, the Court does not find that Ms. Wiley's affidavit is a sham and will not exclude the statements within it from its summary judgment considerations.

2. Affidavit of John S. Bedrow

Defendants seek to exclude the affidavit of Mr. Bedrow from the Court's consideration pursuant to Federal Rule of Civil Procedure 37(c)(1). Specifically, Defendants argue that Mr. Bedrow was never placed in Plaintiff's Rule 26(a) mandatory disclosures as a person likely to have discoverable information. Plaintiff replies that Mr. Bedrow only recently replaced Mr. Jack Byrom as Project Manager of the Farad Dam project and that Defendants would have learned of him had they sought to depose Mr. Byrom. Plaintiffs also point out that Mr. Byrom was properly disclosed as required.

Rule 37(c)(1) provides that a party that "without substantial justification fails to disclose information required by Rule 26(a) . . . or to amend a prior response to discovery as required by Rule 26(e)(2), is not, unless such failure is harmless, permitted to use as evidence . . . on a motion any witness or information not so disclosed." Fed.R.Civ.P. 37(c)(1). Plaintiff has provided no argument that a substantial justification exists for the failure to update the mandatory Rule 26(a) disclosures as required by Rule 26(e)(1). However, the Court also notes that Defendants have not requested leave to conduct discovery relating to the evidence tendered by Mr. Bedrow and apparently made no attempt to depose Mr. Byrom.

Despite the Court's disappointment with Plaintiff's failure to update its disclosures properly, the Bedrow evidence will not be excluded from consideration as any error is harmless. The major purpose of the provided affidavit is to note the specific expenditures made on the Farad Dam project. This information was known by Mr. Byrom and could have been presented by affidavit through Mr. Byrom. As such, the information is not specific to Mr. Bedrow and the inclusion of that evidence provides no prejudice to Defendants above and beyond that which naturally comes from properly presented evidence opposed to one's position. Accordingly, the Court will not exclude the affidavit of Mr. Bedrow from consideration when discussing summary judgment.

B. Summary Judgment

The Court now turns to Defendants' motion for summary judgment. Contained within the arguments surrounding this motion are two grounds on which requests for summary judgment are based. First, Defendants argue that no repairs have begun and therefore summary judgment must be granted because there has been no compliance with the requirements of the insurance contract. Second, Defendants argue that the one million dollar payment in 2001 served to complete the contract and terminate any potential repair and replacement payments in the future.

1. Lack of Repair, Replacement or Rebuilding Expenses

The Court notes that considering the affidavits of Ms. Wiley and Mr. Bedrow creates a material issue of fact whether expenses have been incurred to rebuild Farad Dam. Defendants argue that no money has been spent, Plaintiff responds by listing certain dollars expended over the years, claiming they are related to rebuilding the dam. The resolution of this issue is one for the jury and summary judgment is not appropriate on this ground. 2. Alleged Actual Cash Value Payment

Defendants argue their one million dollar payment constituted an actual cash value payment that was accepted by Plaintiff, terminating all obligations under the contract to pay for rebuilding costs. Plaintiff contends its acceptance of this payment was never meant to terminate its right to rebuilding costs. The Court notes that an extension of time in which to replace, repair or rebuild the dam was granted after this 2001 payment. As such, the undisputed facts show a course of dealing between the parties that would suggest the one million dollar payment was not meant as a final payment. As such, a material issue of fact exists and summary judgment is inappropriate on this ground as well.

CONCLUSION

It is therefore ORDERED that the Defendants' Motion to Exclude Evidence Submitted by Plaintiff (# 37) is DENIED;

It is further ORDERED that Defendants' Motion for Summary Judgment (# 27) is DENIED.


Summaries of

Sierra Pacific Power Co. v. Hartford Steam Boiler Co.

United States District Court, D. Nevada
Nov 17, 2005
CV-N-04-0034-LRH (RAM) (D. Nev. Nov. 17, 2005)
Case details for

Sierra Pacific Power Co. v. Hartford Steam Boiler Co.

Case Details

Full title:SIERRA PACIFIC POWER COMPANY, a Nevada Corporation, Plaintiff, v. THE…

Court:United States District Court, D. Nevada

Date published: Nov 17, 2005

Citations

CV-N-04-0034-LRH (RAM) (D. Nev. Nov. 17, 2005)