Opinion
Docket No. 78-4308.
Decided January 3, 1980.
Tercha Daavettila, for plaintiffs.
McLean McCarthy, for defendant Lepisto.
Von Wiegan Corcoran, for defendant Wausau Homes, Inc.
Before: ALLEN, P.J., and BASHARA and BEASLEY, JJ.
This cause involves an action for a breach of contract, negligence and breach of implied warranty against Wausau Homes, Inc. (Wausau), manufacturer of factory-built homes from whom plaintiffs purchased a home for $19,055, and George Lepisto, a building contractor and franchise dealer for Wausau, who contracted to clear plaintiffs' lot, construct a foundation, install tile and perform rough grading work for $4,000. After the home was erected in late July, 1977, and plaintiffs commenced occupancy, leaks were found in the foundation. Investigation disclosed the foundation was not built at a depth for which the contract called. Upon receiving this information, plaintiffs filed the instant action against Lepisto, alleging breach of the foundation-site contract. Defendant Lepisto filed a counterclaim demanding the remaining $500 which plaintiffs had not paid on the $4,000 foundation-site contract.
In the spring of 1978, staining and warping were discovered in the ceiling spaces, whereupon plaintiffs amended their complaint to include a claim against Wausau for a defective roof.
At the conclusion of the trial, which continued from July 31, 1978, until August 4, 1978, the jury returned the following verdict: (1) for the plaintiffs against the defendant Wausau for the roof damage, $2,100; (2) for the plaintiffs against the defendant George Lepisto on the foundation claim, $250; (3) for the defendant Lepisto against the plaintiffs on Lepisto's counterclaim, $500, with the proviso that the rough grading work was to be completed.
Plaintiffs do not appeal the award for roof damage against Wausau, but Wausau, by way of cross-appeal, appeals the trial court's failure to grant Wausau's motion for judgment notwithstanding the verdict. Plaintiffs' motion for judgment notwithstanding the verdict, or new trial, or additur on plaintiffs' claim against Lepisto was denied by the trial court on September 28, 1978, and plaintiffs appeal of right. We address the three claims seriatim.
I. PLAINTIFFS' CLAIM AGAINST WAUSAU
Cross-appellant Wausau argues that there was virtually no evidence that the home had an icedamming condition in the winter of 1977-1978, and accordingly the trial court erred when it failed to grant cross-appellant's motion for judgment notwithstanding the verdict. There is no doubt that water seeped through the roof causing stains on the interior of the home. The only question is whether the leakage was caused by "ice damming" resulting from faulty construction of the home by Wausau or was caused, as claimed by Wausau, by "moisture loss phenomenon" common to all homes.
Plaintiffs' expert witness testified that he examined the roof and found partially cracked plywood and improperly placed insulation material obstructing the roof ventilation spaces which allowed heat to penetrate through the roof from inside the house causing snow on the roof to melt, flow down the roof decline, and freeze at the eaves, forming a dam behind which water collected and then seeped through the shingles into the home interior. Though cross-appellant introduced expert testimony that the leakage was moisture loss which occurs in even the most perfectly constructed home, the testimony of plaintiffs' expert was sufficient to raise a question of fact submissible to the jury. Grand Trunk Western R Co v H W Nelson Co, Inc, 116 F.2d 823, 840-841 (CA 6, 1941), reh den 118 F.2d 252 (1941). Viewing the evidence in the light most favorable to the nonmoving party on a motion for judgment notwithstanding the verdict, we find ample evidence to support referring the question to the jury. Ringo v Richardson, 88 Mich. App. 684; 278 N.W.2d 717 (1979).
II. PLAINTIFFS' CLAIM AGAINST LEPISTO
The breach of contract claim against defendant Lepisto is threefold: (1) $2,179.39 for costs of correcting the extensive water leakage in the basement caused because (a) the drain tiles were not placed at proper depth, (b) insufficient quantities of gravel or crushed rock were placed around the tiles, and (c) the ground surface around the basement was not sloped away from the foundation, (2) $1,873 for costs of insulating the foundation so as to prevent frost damage likely to be incurred because the foundation was not dug to the depth required by the contract, and (3) $240 for plaintiffs' work on site preparation plus $400 for future work required to properly clear the lot. The jury returned a verdict in favor of plaintiffs for $250. While the verdict did not identify which claim the $250 award supported, we agree with defendant's counsel that the $250 was awarded on the site preparation and lot-clearing claim. This leaves only items (1) and (2) of plaintiffs' claim against Lepisto to be resolved on appeal.
"On the issue of lot clearing, it is fair to say that the jury returned a verdict for the plaintiffs in the amount of $250, for that portion of the lot clearing they initially did under an oral agreement with Mr. Lepisto that they would get credit for it. Thus, Mr. and Mrs. Kokkonen testified that they spent about 60 hours in clearing the lot, at a time when he was making $4.46 per hour and she was making $3.00 per hour. The plaintiffs' attorney used a figure of $4.00 per hour for approximately 60 hours as a `guideline', and defense counsel did not dispute credit for what the plaintiffs had actually done. On the other hand, defense counsel did dispute the balance of the plaintiffs' claim for $400 for future rough grading and clearing of the stumps left by the plaintiffs' wood cutting operation. It is most reasonable to assume that the jury gave the plaintiffs $250 for the work already done, but rejected their claim for an additional $400." Defendant Lepisto's brief pp 29-30.
We have no problem in affirming the trial court on the claim for water leakage in the basement. Just as a question of fact was presented allowing plaintiffs to submit their claim for damages against Wausau to the jury, so too a question of fact is raised on the claim for water damages allowing the defendant to submit that claim to the jury. Lepisto's defense to the basement water leakage claim was that the leaking basement was due to the lack of fill on the lot and that the responsibility for providing the fill was plaintiffs'. He testified to such effect and this testimony was extensively corroborated by a civil engineer who formerly had taught engineering mechanics at Michigan Technological University. While plaintiffs introduced evidence to the contrary, defendant's testimony was more than sufficient to refer the question to the jury. Accordingly, as to this portion of plaintiffs' claim, the trial court did not err when it denied plaintiffs' motion for a new trial or additur.
A more difficult problem arises in regard to the claim for foundation repairs. The contract between plaintiffs and George Lepisto called for the construction of a foundation in accordance with the Wausau Homes blueprints. The blueprints contained language that the footings should be no less than four feet deep with six blocks on top of the footings. At trial, Lepisto conceded that the wall was only five blocks deep, and because of rock it was impossible to sink footings 48 inches deep. He further testified that he neither informed the owners of the change nor obtained a modification of the building permit. Plaintiffs' expert, Robert Papworth, stated the footings as constructed would be "very much" susceptible to frost damage. Witness Papworth then testified that there were three options available for correcting the breach:
1. A procedure could be followed whereby the foundation would be insulated on the outside with styrofoam, at a cost of $1,873 (Exhibit 16). However, plaintiffs could not leave the home unheated in the winter, should they decide to vacation in Florida.
2. The area under the footing could be dug out and concrete poured in to bring the footing to a proper depth. No estimate of cost was given.
3. The wood frame portion of the house could be raised or jacked up and additional courses of concrete block laid on top of the existing foundation and then fill could be added around the foundation so as to bring the footing to an appropriate depth at an estimated cost of $6,000 to $7,000.
Option 1 was recommended as the most economical and practical means of minimizing the danger of frost damage. Plaintiffs' Exhibit 16 showing option 1 costs of $1,873 was duly admitted into evidence. However, after the close of all proofs and all parties had formally rested, counsel for defendant Lepisto called the court's attention to O'Donnell v Oliver Iron Mining Co, 273 Mich. 27; 262 N.W. 728 (1935), a case in which the Supreme Court held that in actions for structural damage caused by subsidence, damages were not recoverable until the damage had occurred. In the instant case no testimony was introduced that frost damage had in fact occurred, only evidence of a likelihood of it occurring in the future was introduced. Accordingly, the trial court reversed its earlier ruling, excluded Exhibit 16 and charged the jury:
"You are further instructed that you are to disregard the estimates by Mr. Papworth for the cost of remedying any potential frost damage to the foundation and its footings. The exhibit containing this estimate is not allowed by the Court."
The court then refused, over plaintiffs' objection, to give any instruction as to the measure of damages on the claim for improper construction of the foundation. Plaintiffs' requested instructions Nos. 18-21 set forth the measure of damages if the jury found a breach of contract on the matter of the depth of the footings. Then, when plaintiffs' counsel, in arguing plaintiffs' case to the jury, referred to witness Papworth's testimony that the cost of placing the footings below the frost line would be between $6,000 and $7,000, objection was made by opposing counsel. The objection was sustained, the trial court saying:
Requested Instruction No. 18: "amount awarded should be measured by the reasonable expense of necessary repairs".
Requested Instruction No. 19: "amount awarded should be measured by the difference between the fair market value of the home had the footings been constructed in accordance with the contract and the value of the home with footings as actually constructed."
Requested Instruction No. 20: "amount awarded should be measured by the reasonable expense of necessary, corrective action on the footings plus the loss in value of the home, if any, between the fair market value of the home had the footings been constructed in accordance with the contract and the value of the home with footings as actually constructed."
Requested Instruction No. 21: "then you should award such an amount of damages as would place the plaintiffs in the same position as they would have been if the foundation contract had been fully and properly performed". The court rejected these instructions and gave a generalized instruction that if the jury found defendants breached their contract, "your verdict should be in such an amount that fairly compensates the plaintiffs for the damages which arise naturally from the breach".
"THE COURT: The amount of damages, Ladies and Gentlemen of the Jury, the amount is to be left in your sole discretion, I'll put it that way. Any arguments by counsel as to the figures as to what you should return in the form of damages is not to be taken by you as evidence in this case. All right."
We conclude that the trial court erred. The court's ruling, though permitting the jury to award an amount which would fairly compensate plaintiffs, precluded the jury from considering the evidence of damages. Instructions on damages must be related to the evidence in the case. 25A CJS, Damages, § 180; 22 Am Jur 2d, Damages, § 345. When the trial court instructed the jury to disregard the exhibits and testimony regarding costs, the court shut the door on any award of damages. Given the strong admonitions of the court, we cannot conceive how a jury would venture to award anything even if they found the contract was breached in regard to the depth of the footings.
Unfortunately, though understandingly, the court's reliance on O'Donnell v Oliver Iron Mining Co, supra, was misplaced. That case is inapposite on four grounds. First, unlike the case before us where there was a contract between plaintiffs and defendant, the suit was solely in tort. Second, actions for damages for subsidence, where repeated slides of earth occur, appear to carry their own special rules on damages. Third, in O'Donnell, the Court reduced a jury award based on a future total destruction of the property but did award damages for the cost of repairs. In the instant case, the cost of repairs (Exhibit 16) was excluded. Fourth, the O'Donnell court itself cautioned that its holding would not apply where the damages, though still in futuro, were bound to occur. Id., p 40.
See 9 Michigan Law and Practice, Damages, §§ 22, 23. In § 23, p 36, the O'Donnell decision is mentioned in a separate paragraph discussing damages for "withdrawal of lateral supports through mining operations not subjacent or adjacent to the property, but a considerable distance therefrom".
As was stated in O'Donnell, in futuro damages are allowable if bound to occur. For example, if one contracts to buy an automobile with rustproofing and the car is delivered without rustproofing, it is not necessary to wait until the car rusts through before recovering damages. The fact that the car would ultimately rust is so reasonably certain that it is not necessary to wait until the damage occurs. In the case before us the issue was whether (a) Lepisto failed to construct the footings and foundation in accordance with the Wausau blueprints, and (b) if so, whether such failure created a reasonable certainty of damage from frost upheaval. On both questions the testimony was conflicting, particularly on question (b). However, plaintiffs' proof of the certainty of future damage was strong and persuasive. Based on the testimony, it was for the jury to first decide whether damage was so likely to occur. Gilson v Bronkhorst, 353 Mich. 148, 153-158; 90 N.W.2d 701 (1958), Prince v Lott, 369 Mich. 606, 609-610; 120 N.W.2d 780 (1963), Johnson v C O R Co, 6 Mich. App. 611, 617; 150 N.W.2d 178 (1967), Savage v Parts Warehouse Co, 19 Mich. App. 416, 419; 173 N.W.2d 7 (1969).
"Q. Mr. Papworth, the 48 inch standard that you referred to, that is a minimum standard?
"A. The 48 inch depth of frost is the commonly used engineering figure for the Copper Country area for the depth of footings below the surface of the ground.
"Q. Okay. And is it your testimony that in certain areas the frost would penetrate further than that, and under some circumstances it might be less than that?
"A. That is correct.
* * *
"Q. Is it your opinion, sir, that anyone who constructs a foundation and has the bottom of the footing less than 48 inches is taking a considerable chance?
"A. Yes.
"Q. Because if the frost does penetrate, the house could in fact be ruined, isn't that true, sir?
"A. Yes."
In this regard, the following statements are instructive:
"As a general rule, where a cause of action is complete a recovery may be had of prospective damages which it is reasonably certain will accrue. * * * Where no subsequent action may be maintained, all damages present and future may be recovered." 25 CJS, Damages § 29.
"Prospective damages — that is, damages which compensate for future losses reasonably certain to arise from a past breach of a contract promise — can be recovered when there is a total breach of a promise which has formed the consideration for an entire and indivisible contract." 22 Am Jur 2d, Damages, § 29, p 49.
and, see generally, McCormick, Damages (1971 ed), §§ 13, 28, 161. Therefore, to the extent that plaintiffs in the case at bar have submitted proofs to a reasonable degree of certainty of damages which have not yet accrued at the time of trial, but which in the nature of things must necessarily or most probably will result from defendant's alleged breach of contract, we conclude that plaintiffs were entitled to submit the question of future damages to the jury. Compare, Tucker v Tucker, 24 Mich. 426, 428 (1872), Arnone v Chrysler Corp, 6 Mich. App. 224, 228-229; 148 N.W.2d 902 (1967). Accordingly, it is necessary to conclude that the trial court erred in precluding the jury from a proper consideration of the damages alleged by plaintiffs to have been caused by defendant Lepisto's improper construction of the foundation.
Therefore, plaintiffs' claim for repairing the foundation to prevent frost damage is remanded to the trial court for retrial. Upon retrial, and assuming plaintiffs' proofs are substantially similar to the testimony in the present case, the jury shall decide whether defendant Lepisto breached the contract and, if so, whether such breach created a reasonable certainty of damage from frost upheaval. If the jury answers that question in the affirmative, damages shall be awarded.
We note that the question of damages arising from a breach of contract is normally assigned to the jury where such question is based on conflicting evidence. However, since the question of future or prospective damages requires a "reasonable certainty" that the damages will result from the original breach, the trial court is required, as a matter of law, to determine the sufficiency of the evidence before the question of damages can be submitted to the jury. Gilson v Bronkhorst, supra, at 155, and see 25A CJS, Damages, § 176(3) pp 172-173. Nonetheless, presuming as we have in this case that plaintiffs' proofs on retrial will be substantially similar to those which were previously offered, we would find that plaintiffs have established the necessary degree of probability of the apprehended future consequences of the breach as to amount to a reasonable certainty that the damages will occur. In re Boyer's Estate, 282 Mich. 552, 556; 276 N.W. 552 (1937), Kellom v City of Ecorse, 329 Mich. 303, 308; 45 N.W.2d 293 (1951). Sufficient, at least, to submit the issue to the jury.
In awarding damages, the jury is required to be instructed as to the proper measure of damages. Gutov v Clark, 190 Mich. 381; 157 N.W. 49 (1916). In this regard, the trial court is required to instruct the jury in accordance with the correct rule of law concerning the breach of construction contracts by the builder:
"The rule is that where the contract is substantially complied with, and the building is such a one as is adapted for the purpose for which it was constructed, and only slight additions or alterations are required to finish the work according to the contract, the defects being remediable at a reasonable expense, and without interfering with the rest of the structure, the measure of damages is such a sum as is necessary to make the building conform to the plans and specifications. But, where the defects are such that they cannot be remedied without the entire demolition of the building, and the building is worth less than it would have been if constructed according to the contract, the measure of damages is the difference between the value of the building actually tendered, and the reasonable value of that which was to be built." Gutov v Clark, supra, at 387.
Accord, Otto Misch Co v E E Davis Co, 241 Mich. 285, 294-296; 217 N.W. 38 (1928), P M Construction Co, Inc v Hammond Ventures, Inc, 3 Mich. App. 306, 315; 142 N.W.2d 468 (1966), Dierickx v Vulcan Industries, 10 Mich. App. 67; 158 N.W.2d 778 (1968) (warranty action), Caradonna v Thorious, 17 Mich. App. 41, 45; 169 N.W.2d 179 (1969), Schultz v Sapiro, 23 Mich. App. 324, 327-328; 178 N.W.2d 521 (1970), Baranowski v Strating, 72 Mich. App. 548, 562-563; 250 N.W.2d 744 (1976) (negligence action). And see, 7 Callaghan, Michigan Civil Jurisprudence, Damages, § 94, 25 CJS, Damages, §§ 74-76, Anno: Cost of correction or completion, or difference in value, as measure of damages for breach of construction contract, 76 ALR2d 805, 5 Corbin on Contracts, §§ 1089-1091, Restatement, Contracts, § 346, 13 Am Jur 2d, Building and Construction Contracts, §§ 76, 79, 80, 81. On remand, the lower court is required to instruct the jury on the proper measure of damages consistent with the proofs introduced at trial.
III. DEFENDANT LEPISTO'S COUNTERCLAIM
On the counterclaim, the jury returned a verdict as follows: "[F]or George Lepisto against Robert Kokkonen for $500.00, with rough grading to be completed" (emphasis added). Plaintiffs' counsel did not object to the verdict at the time, but soon thereafter filed a post-trial motion challenging the verdict on grounds that under the decision in J Richardson Co v Noble, 143 Mich. 546; 107 N.W. 274 (1906), the jury exceeded its authority. Following a hearing, the trial court characterized the emphasized language as mere surplusage and ordered that it be stricken from the judgment.
On appeal, Lepisto contends that J Richardson Co, supra, is distinguishable because here, unlike the situation in that case, it is altogether possible that the jury intended that the plaintiffs, not Lepisto, finish the rough grading. In addition, it is argued that plaintiffs waived any error by failing to request on the date the verdict was given that the jury be returned for further deliberations so that a proper verdict could be rendered. White v Huffmaster, 321 Mich. 225; 32 N.W.2d 447 (1948).
We disagree. The rough grading work was never characterized as anyone's responsibility other than Lepisto's. Further, it would be totally redundant and unnecessary to add the proviso if the jury had intended that the work be completed by the Kokkonens. If that had been the jury intent, all the jury would have to do is omit the emphasized words.
It is our opinion that if the jury had known it could not combine specific performance with a money judgment, the jury would have granted a greater sum of money. In this respect we find the instant situation similar to Richardson. In particular, we believe that had the jury known that it was beyond its power to order Lepisto to finish the grading, it may well have allowed more than $250 on the site preparation portion of the plaintiffs' claim. See footnote 1, supra. Likewise, we reject defendant's waiver argument. We find no case holding that counsel's failure to immediately object to the jury's verdict precludes all future claims on that issue. Such cases as there are on this point suggest that it is the duty of the trial court to correct defective and irregular verdicts. McCormick v Hawkins, 169 Mich. 641, 649; 135 N.W. 1066 (1912), Sadlowski v Meeron, 240 Mich. 306, 313; 215 N.W. 422 (1927). Plaintiffs' motion for a new trial, additur or judgment notwithstanding the verdict sufficiently precluded the claim of waiver.
"But it is said that part of the verdict giving plaintiff possession of the shoes may be treated as surplusage and the balance of the verdict be permitted to stand. We cannot assent to this suggestion because we think it clear the money part of the verdict would not have been rendered if the jury had understood they had no authority to decide who was entitled to the possession of the shoes then in the warehouse." Richardson, supra, at 549-550.
Accordingly, the order of the trial court denying plaintiffs' motion for judgment notwithstanding the verdict, additur, or a new trial is reversed with respect to the counterclaim. In addition, the judgment entered on the counterclaim is vacated. A new trial is ordered on the counterclaim and on plaintiffs' claim for repair of the foundation to prevent damage from frost. In all other respects, the order and judgment of the trial court are affirmed.
Affirmed in part, reversed in part, and remanded in accordance with this opinion. Costs to plaintiffs on the claim against Wausau Homes, Inc. No costs between plaintiffs and defendant Lepisto, neither party having prevailed in full.