Ecological Rights Found. v. PacifiCorp

United States District Court, Northern District of California
Jun 26, 2024
23-cv-05179-JST (N.D. Cal. Jun. 26, 2024)

Opinion

23-cv-05179-JST

06-26-2024

ECOLOGICAL RIGHTS FOUNDATION, Plaintiff, v. PACIFICORP, et al., Defendants.


ORDER DENYING MOTION TO DISMISS Re: ECF No. 32

JON S. TIGAR UNITED STATES DISTRICT JUDGE

Before the Court is Defendants PacifiCorp and Pacific Power's (together “PacifiCorp”) motion to dismiss Plaintiff Ecological Rights Foundation's (“EcoRights”) first amended complaint (“FAC”). ECF No. 32. The Court will deny the motion.

I. BACKGROUND

A. Factual Background

The facts are taken from the First Amended Complaint except where otherwise stated. See AE ex rel. Hernandez v. Cnty. of Tulare, 666 F.3d 631, 636 (9th Cir. 2012) (“[W]e accept the factual allegations of the complaint as true and construe them in the light most favorable to the plaintiff.”).

EcoRights is a “non-profit public benefit corporation focused on protecting surface waters and groundwater from pollution and degradation.” ECF No. 23 ¶ 16. PacifiCorp “is an electrical utility corporation that supplies electricity to parts of Northern California, Oregon, and Washington.” Id. ¶ 18. “To maintain its electrical distribution system, PacifiCorp operates and maintains numerous corporation yards and service centers throughout its territory” which includes a facility at 1054 Northcrest Drive, Crescent City, California 95531 (the “Crescent City Facility” or “Facility”). Id. ¶¶ 2, 77.

1. Crescent City Facility

The Crescent City Facility “serves as a staging ground for the construction, operation, and maintenance of PacifiCorp's electric transmission and distribution systems.” Id. ¶ 95. PacifiCorp stores “new, freshly treated utility poles, used treated utility poles or cross-arms (collectively, ‘Poles') and treated wood waste (‘TWW')” at the Crescent City Facility. Id. ¶ 2. The Poles and TWW are treated with “wood preservative formulations, including the pesticide pentachlorophenol, chromium, arsenic, copper naphthenate, and/or 4,5-Dichloro-2-n-octyl-3(2H)-isothiazolone (collectively ‘Wood Treatment Mixtures').” Id. PacifiCorp stores the Poles and TWW uncovered in outdoor areas. Id. ¶ 95. The Facility includes a transportation terminal and vehicle fueling area where PacifiCorp conducts vehicle maintenance and servicing on light duty and heavy-duty cars, trucks, and cranes. Id. ¶ 97. Pollution from this activity includes “gasoline, diesel fuel, anti-freeze, battery fluids, and hydraulic fluids.” Id. Finally, EcoRights alleges that PacifiCorp stores various construction materials and equipment (including electric transmission and distribution system components) uncovered in outdoor areas. Id. ¶ 98. PacifiCorp has not applied for an individual National Pollutant Discharge Elimination System (“NPDES”) permit for the Crescent City Facility. Id. ¶ 171.

“TWW means any wood items or fragments thereof that have been treated with any of the Wood Treatment Mixtures but that are not complete Poles and/or cross-arms destined for service, which includes, but is not limited to, out of service utility poles, used utility pole segments, out of service cross arms, used cross arm segments, sawdust, splinters, wood chips, and any other wood pieces and/or fragments.” ECF No. 23 ¶ 2 n.1.

2. Alleged Clean Water Act and Resource Conservation and Recovery Act Violations

EcoRights asserts two claims: (1) violations of the Clean Water Act (“CWA”), 33 U.S.C. §§ 1251-1387 and (2) violations of the Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. §§ 6901-6992.

First, because the Poles and TWW are stored outdoors in uncovered areas, EcoRights alleges that Wood Treatment Mixtures and associated chemicals (collectively “Wood Treatment Waste”) drip off the Poles and TWW and are collected by storm water at the Crescent City Facility. ECF No. 23 ¶ 100. Similarly, pollutants are also collected from the transportation terminal and the uncovered storage of construction materials. Id. ¶¶ 95-97, 102. Thereafter, EcoRights alleges that the storm water collects in, and moves through “culverts, storm water collection vaults, ditches, gutters, and other conveyances and surface channels at, and adjacent to the Crescent City Facility; drop inlets that connect with underground storm sewer pipes . . . and other conveyances,” and ultimately “into waters of the United States, including but not limited to, Elk Creek in Crescent City, California and its estuary and tributaries; the Elk Creek Wetlands Wildlife Area; Crescent City Harbor; and the Pacific Ocean in and around Crescent City Harbor.” Id. ¶¶ 100, 103. EcoRights argues that the Facility's stormwater discharges violate the CWA. Id. ¶¶ 169-179.

Second, EcoRights alleges that PacifiCorp's use, storage, and movement of the Poles and/or TWW “causes the Wood Treatment Wastes to infiltrate into and contaminates soils and groundwater.” Id. ¶ 48. In addition to stormwater discharge, EcoRights alleges that the Wood Treatment Wastes are also discharged from the Crescent City Facility by “tracking from vehicles and/or foot traffic and/or by wind, leaf blower, sweeping, power washing, and/or other natural or artificial processes.” Id. ¶¶ 48, 61. EcoRights claims that the Wood Treatment Wastes present an imminent and substantial endangerment to the health of communities and the environment in violation of RCRA. Id. ¶ 49. EcoRights alleges that its members use and enjoy the waters, wildlife, and other natural resources that are adversely impacted and endangered by PacifiCorp's contaminated discharges. Id. ¶ 17.

B. Procedural Background

On June 7, 2023, EcoRights served a citizen suit notice letter (“Notice Letter”) on PacifiCorp regarding alleged violations of RCRA and the CWA at the Crescent City Facility, stating EcoRights' intention to file suit against PacifiCorp. ECF No. 23 ¶ 10; see also 33 U.S.C. § 1365(b); 40 C.F.R. § 135.2; 42 U.S.C. § 6972(b). Thereafter, EcoRights filed its complaint on October 11, 2023. ECF No. 1. PacifiCorp filed a motion to dismiss on November 17, 2023. ECF No. 17. EcoRights filed its FAC as a matter of right on November 29, 2023. ECF No. 23. PacifiCorp then filed the instant motion to dismiss EcoRights' FAC. ECF No. 32. The Court heard argument on the motion on March 14, 2024. ECF No. 62. The parties requested, and the Court allowed, the filing of a joint supplemental brief on June 12, 2024. ECF Nos. 74, 75.

PacifiCorp challenges the sufficiency of EcoRights' CWA and RCRA claims. PacifiCorp also argues that EcoRights waived the right to bring RCRA claims.

II. JURISDICTION

The Court has jurisdiction under 28 U.S.C. § 1331.

III. REQUEST FOR JUDICIAL NOTICE

The Court first addresses the parties' requests for judicial notice. PacifiCorp requests judicial notice of several documents in support of its motion to dismiss and its reply. ECF No. 32 at 9-10; ECF No. 47; see also Fed.R.Evid. 201(b). EcoRights opposes the request for judicial notice for Exhibits E and F (the site plan and the list of PacifiCorp's power generation and transmission facilities) because the documents are “subject to reasonable dispute” since the “facts asserted therein are neither ‘generally known' . . . nor “can [they] be accurately and readily determined from sources whose accuracy cannot reasonably be questioned.” ECF No. 40 at 2 (citing Fed.R.Evid. 201(b)). EcoRights also opposes the inclusion of Exhibits G through L, filed in support of PacifiCorp's reply, ECF Nos. 46-1 to 46-6, because allowing PacifiCorp to introduce these documents denies EcoRights a “fair opportunity to address or otherwise respond to the new evidence.” ECF No. 52 at 2.

Exhibit B: The California State Water Resources Control Board's (“Board”) IGP Fact Sheet, ECF No. 17-2 at 8; Exhibit C: The Board's April 1, 2014, Order establishing its Industrial Storm Water General Permit Program, and Attachment A to that Order, ECF No. 18-1 at 4; Exhibit D: The Introduction to the Occupational and Safety Health Administration's 1987 Standard Industrial Classification (“SIC”) Manual, ECF No. 18-1 at 82; Exhibit E: A site plan of the Crescent City Facility, showing the location of various activities and storage areas at the Facility, ECF No. 18-1 at 92; Exhibit F: A list of all PacifiCorp's power generation and transmission facilities located near Crescent City California, as identified by the Board, ECF No. 18-1 at 94; Exhibit G: A service copy of the EcoRights' CWA and RCRA Notice Letter to PacifiCorp including the postmark and receipt information, ECF No. 46-1; Exhibit H: California State Water Resources Board's National Pollution Discharge Elimination System (NPDES) General Permit for Storm Water Discharges From Small Municipal Separate Storm Sewer Systems, ECF No. 46-2; Exhibit I: Crescent City Municipal Code § 12.36.120 and § 12.36.280, ECF No. 46-3; Exhibit J: A screenshot of the State Water Board's website for its industrial storm water regulatory program, which can be accessed at the following website: https://waterboards.ca.gov/water issues/programs/stormwater/industrial.html, ECF No. 46-4; Exhibit K: A screenshot of the website describing SIC Code 4231 from https://www.naics.com/sic-industry-description/?code=4231, ECF No. 46-5; Exhibit L: A screenshot of the website describing SIC Code 1442 from https://www.naics.com/sic-industry-description/?code=1442, ECF No. 46-6.

Separately, in support of its opposition to PacifiCorp's motion to dismiss, EcoRights attaches the declaration of Stuart Wilcox (“Wilcox Declaration”) and several exhibits. ECF Nos. 39-2 to 39-7. PacifiCorp objects to the Wilcox Declaration and the supporting exhibits. ECF No. 49. The exhibits are not accompanied by a request for judicial notice.

Exhibit 1: Proof of Service, ECF No. 39-2; Exhibit 2: L.A. Unified Sch. Dist. v. S&W Atlas Iron & Metal Co., No. 20-cv-5330, Dkt. 48 (motion to dismiss) (C.D. Cal. August 19, 2020), ECF No. 39-3; Exhibit 3: second amended complaint filed in LA Waterkeeper v. SSA Terminals, LLC, No. 22-01198, Dkt. 93-1 (C.D. Cal. Dec. 15, 2023), ECF No. 39-4; Exhibit 4: Attachment C, Glossary, to the State Water Resources Control Board's “National Pollution Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Industrial Activities,” Order NPDES No. CAS000001, Order No. 2014-0057-DWQ, As Amended by Order No. WQ 2015-0122-DWQ & Order No. WQ 2018-0028-DWQ. Available online at: https://www.waterboards.ca.gov/boarddecisions/adoptedorders/waterquality/2018/wqo20180028-dwq.pdf, ECF No. 39-5; Exhibit 5: State Water Resources Control Board in Ecological Rights Foundation, et al., v. Hot Line Construction, Inc., et al., 20-1108, ECF No. 39-6; Exhibit 6: Excerpt of a June 12, 2014 Memorandum drafted by the U.S. Environmental Protection Agency entitled “Ninth Circuit Court of Appeals Decision in Ecological Rights Foundation v. Pacific Gas and Electric Company Regarding the RCRA Definition of Solid Waste.” Available online at: https://www.epa.gov/sites/default/files/2014-07/documents/erfpgeco-rcramemo.pdf, ECF No. 397.

“Generally, district courts may not consider material outside the pleadings when assessing the sufficiency of a complaint under Rule 12(b)(6).” Khoja v. Orexigen Therapeutics, Inc., 899 F.3d 988, 998 (9th Cir. 2018). An exception allows a court to consider “matters of public record without converting a motion to dismiss into a motion for summary judgment.” Id. at 999. But a court cannot take notice of disputed facts contained in such public records. Id. (citing Fed.R.Evid. 201(b)). “Courts routinely take judicial notice of letters published by the government . . . as well as records and reports of administrative bodies.” Smith v. L.A. Unified Sch. Dist., 830 F.3d 843, 851 n.10 (9th Cir. 2016) (citations and internal quotation marks omitted).

The Court declines to take judicial notice of PacifiCorp's Exhibits E, F, G, I, J, K, and L because it finds the documents unnecessary to resolve the instant motion. Cal. Sportfishing Protection All. v. Shiloh Grp., LLC, 268 F.Supp.3d 1029, 1039 (N.D. Cal. 2017) (denying request for judicial notice of documents the court did not consider in deciding the motion). Despite EcoRights' initial objection to Exhibit H, it ultimately used and addressed this document in its sur-reply. ECF No. 59 at 3. Accordingly, the Court takes judicial notice of Exhibit H. The Court also grants PacifiCorp's request for judicial notice of the remaining documents as public records but limits the judicially noticed fact in each instance to the existence of the document, not the truth of the matters asserted in the documents. Cal. Sportfishing Protection All., 268 F.Supp.3d at 1038. The Court has not considered the exhibits to the Wilcox Declaration because they are not properly before the Court.

IV. LEGAL STANDARD

The motion is styled as having been made under Rules 12(b)(1) and 12(b)(6) of the Federal Rules of Civil Procedure. ECF No. 32 at 7. Beyond that single reference to Rule 12(b)(1), however, there is no discussion of the Court's jurisdiction (or lack thereof) over the case, and during the motion hearing, defense counsel conceded that PacifiCorp's motion contained “no jurisdictional argument.” ECF No. 64 at 2:18-25. The reference to Rule 12(b)(1) appears to have been imported from Defendant's prior motion to dismiss. ECF No. 17-1 at 5, 16-17. Because Defendants make no substantive arguments concerning Rule 12(b)(1), the Court applies only the legal standard for a motion to dismiss under Rule 12(b)(6).

To survive a motion to dismiss under Federal Rule of Civil Procedure 12(b)(6), a complaint must contain “a short and plain statement of the claim showing that the pleader is entitled to relief.” Fed.R.Civ.P. 8(a)(2). Dismissal “is appropriate only where the complaint lacks a cognizable legal theory or sufficient facts to support a cognizable legal theory.” Mendiondo v. Centinela Hosp. Med. Ctr., 521 F.3d 1097, 1104 (9th Cir. 2008). “[A] complaint must contain sufficient factual matter, accepted as true, to ‘state a claim to relief that is plausible on its face.'” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)). Factual allegations need not be detailed, but facts must be “enough to raise a right to relief above the speculative level.” Twombly, 550 U.S. at 555.

“A claim has facial plausibility when the plaintiff pleads factual content that allows the court to draw the reasonable inference that the defendant is liable for the misconduct alleged.” Iqbal, 556 U.S. at 678. While this standard is not “akin to a ‘probability requirement,' . . . it asks for more than a sheer possibility that a defendant has acted unlawfully.” Id. (quoting Twombly, 550 U.S. at 556). “Where a complaint pleads facts that are ‘merely consistent with' a defendant's liability, it ‘stops short of the line between possibility and plausibility of entitlement to relief.'” Id. (quoting Twombly, 550 U.S. at 557). In determining whether a plaintiff has met the plausibility requirement, a court must “accept all factual allegations in the complaint as true and construe the pleadings in the light most favorable” to the plaintiff. Knievel v. ESPN, 393 F.3d 1068, 1072 (9th Cir. 2005). A plaintiff may “plead[] facts alleged upon information and belief where the facts are peculiarly within the possession and control of the defendant or where the belief is based on factual information that makes the inference of culpability plausible.” Soo Park v. Thompson, 851 F.3d 910, 928 (9th Cir. 2017) (quoting Arista Recs., LLC v. Doe 3, 603 F.3d 110, 120 (2d Cir. 2010)).

V. DISCUSSION

A. Clean Water Act

The CWA is designed to “restore and maintain the chemical, physical, and biological integrity of the Nation's waters.” Ecological Rts. Found. v. Pac. Gas & Elec. Co., 713 F.3d 502, 505 (9th Cir. 2013) (“ERF I”) (citing 33 U.S.C. § 1251(a)). With limited exceptions, it prohibits the discharge of pollutants into the navigable waters of the United States. 33 U.S.C. §§ 1311(a), 1362(12). Any discharge of a pollutant from a point source into navigable waters is unlawful unless the discharge is covered by a NPDES permit. 33 U.S.C. § 1311(a).

Stormwater presents a “unique problem under the CWA, because it is a significant source of water pollution but is not ‘inherently a nonpoint or point source.'” ERF I, 713 F.3d at 505. Congress amended the CWA in 1987 to regulate stormwater, establishing a two-phased approach. Id. In Phase I, “EPA required NPDES permits for the most significant stormwater discharges: those from a prior permitted source or large municipality; those that “contribute[ ] to a violation of a water quality standard or [are] a significant contributor of pollutants to waters of the United States;” and, relevant here, those “associated with industrial activity.” Id. In Phase II, the EPA promulgated regulations that required permitting for storm water discharges from small municipal facilities (“MS4”) and from construction activity disturbing between one and five acres. Id.; see also 40 C.F.R. § 122.26(a)(9)(i).

Each state administers its own EPA-approved permit program for discharges. 33 U.S.C. § 1342(b). In California, the State Water Resources Control Board (“State Board”) has approval from the EPA to administer the NPDES permit program for the State. ECF No. 23 ¶ 28; ECF No. 17-2 at 8. The State Board issues NPDES permits regulating discharges. Id. For this purpose, the State Board adopted the “National Pollution Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Industrial Activities.” ECF No. 18-1 at 4. However, a State Board's decision to leave a facility unregulated does not foreclose a court from finding that a facility's stormwater discharge into navigable waters violates the CWA. Ass'n to Protect Hammersley v. Taylor Res., 299 F.3d 1007, 1012-13 (9th Cir. 2002); see also S.F. Baykeeper v. Cargill Salt Div., 481 F.3d 700, 706 (9th Cir. 2017) (“[W]e have held that a court may, in entertaining a citizen suit, decide whether a discharge of particular matter into navigable waters violates the CWA even though the regulating agency determined that the discharge was not subject to the requirement of a permit.”)

Accordingly, to state a claim under the CWA, a plaintiff must allege “(1) the ongoing addition of (2) a pollutant (3) to the navigable waters of the United States (4) from a point source (5) without a permit (or in violation of a permit).” Woodward v. Goodwin, No. 99-cv-1103-MJJ, 2000 WL 694102, at *5 (N.D. Cal. May 12, 2000). Furthermore, considering the special circumstances surrounding stormwater, a plaintiff must also allege that the discharges fell within the Phase I or Phase II categories of stormwater discharges that are required to obtain a permit. ERF I, 713 F.3d at 505-506.

PacifiCorp argues that EcoRights has not adequately alleged that: (1) discharges from the Crescent City Facility come from a point source; and that (2) the Crescent City facility generates stormwater “associated with industrial activity.” ECF No. 32 at 10-18. Instead, PacifiCorp claims that the Facility is covered by Crescent City's MS4 permit. ECF No. 45 at 6-9. The Court reviews each of these arguments in turn.

1. Point Source

Although PacifiCorp initially argues that EcoRights failed to allege that discharges from PacifiCorp's Crescent City Facility are conveyed by a “point source,” ECF No. 32 at 10-12, it later concedes this point, ECF No. 45 at 8 (“EcoRights has alleged multiple ‘point sources' by conveyances, inlets, pipes, etc. at the Facility.”). Accordingly, because the parties agree that EcoRights has adequately alleged point sources as required under the CWA, the Court denies the motion on this ground.

2. Municipal Stormwater Permit

Having admitted that EcoRights has alleged a point source, PacifiCorp argues for the first time in its reply brief that the Crescent City Facility is not “required to obtain coverage . . . since its discharges were chosen not to be regulated directly,” and are instead regulated “under the State's Phase II Small MS4 General Permit.” ECF No. 45 at 6-9. In its sur-reply, EcoRights responds that neither the CWA nor EPA's implementing regulations allow for a point source to be exempted based on the existence of a municipal discharge permit for the City. ECF No. 59 at 2-5.

The question before this Court is whether Crescent City's MS4 permit obviates the need for a separate industrial stormwater discharge permit. The Court concludes that it does not. Although there is no clear Ninth Circuit guidance on this issue, the plain language of the CWA, implementing EPA regulations, and the Crescent City MS4 permit indicate that there is a need for an independent permit for an industrial facility even if there is a pre-existing MS4 permit for the City.

The CWA provides for separate permits for stormwater discharges from an industrial facility and stormwater discharges from municipal sources. Compare 33 U.S.C § 1342(p)(3)(A) and 1342(p)(3)(B) (separate permit requirements for industrial discharges and municipal discharges). Furthermore, as described above, EPA implemented regulations for industrial and municipal discharges in two phases Phase I covering industrial activities and large municipal facilities, and Phase II covering small municipal facilities. ERF I, 713 F.3d at 505. EPA's final rules for permits also view industrial stormwater permits as separate and distinct from municipal permits. The NPDES regulation preamble finds that “discharges through a municipal storm sewer need to be covered by an NPDES permit that is independent of the permit issued for discharges from the municipal separate sewer system.” National Pollutant Discharge Elimination System Permit Application Regulations for Storm Water Discharges, 55 Fed.Reg. 47,990, 47,995 (Nov. 16, 1990) (codified at 40 C.F.R. pts. 9, 122, 123 and 124) (emphasis added). Thus, the statutory structure and implementing regulations envision “different permitting schemes, serving discrete purposes” for “stormwater discharges from three potential sources: municipal separate storm sewer systems, construction activities, and industrial activities.” Conservation L. Found., Inc. v. Pease Dev. Auth., No. 16-cv-493-SM, 2017 WL 4310997, at *9 (D.N.H. Sept. 26, 2017). The distinct permitting requirements give “rise to an inference that the [] sources invoke different environmental concerns, requiring separate monitoring and management efforts.” Id.; see also Puget Soundkeeper All. v. Cruise Terminals of Am., LLC, 216 F.Supp.3d 1198, 1207-08 (W.D. Wash. 2015); Kleinman v. City of Austin, No. 1:15-CV-497-RP, 2017 WL 3585792, at *5 (W.D. Tex. Aug. 18, 2017).

The Crecent City MS4 Permit also expressly states that the MS4 permittee must “determine if the facilities that are required to be covered under the Statewide Industrial General Permit have done so,” and if they have not, the permittee must “notify the appropriate Regional Water Board.” ECF No. 46-2 at 6. Accordingly, “[t]he Municipal Permit itself states that a separate NPDES permit is required for facilities that create stormwater discharges associated with industrial activity.” Puget Soundkeeper All., 216 F.Supp.3d at 1207-08.

If the Crescent City Facility does, in fact, qualify as an operator of an industrial facility under the regulations, the Facility is required to secure permit coverage to discharge industrial stormwater regardless of whether the City has an independent MS4 permit for its municipal discharges. The Court will not dismiss the complaint based on the existence of Crescent City's MS4 permit.

3. Industrial Activity

PacifiCorp argues that EcoRights has failed to state a claim under the CWA because EcoRights has failed to allege how the Crescent City Facility qualifies as an “industrial activity” such that PacifiCorp would be required to obtain a stormwater discharge or NPDES permit. ECF No. 32 at 13-16. Instead, PacifiCorp claims that the Facility is an “auxiliary facility” supporting its primary activity of electrical power generation and distribution that is exempt from such permitting requirements. Id. at 17-18. Neither argument is persuasive.

a. Primary Industrial Activity

The CWA requires an NPDES permit for storm water discharges “associated with industrial activity.” Friends of Outlet Creek v. Grist Creek Aggregates, LLC, No. 16-CV-00431-JSW, 2019 WL 1975434, at *7 (N.D. Cal. Mar. 19, 2019); 33 U.S.C. § 1342(p)(2)(B). Discharges from industrial activity are “discharge[s] from any conveyance that is used for collecting and conveying storm water and that is directly related to manufacturing, processing or raw materials storage at an industrial plant.” 40 C.F.R. § 122.26(b)(14). EPA's regulations list several categories of industrial facilities that “are engaging in ‘industrial activity'” for purposes of Section 122.26(b)(14). Id. The list includes certain Standard Industrial Classification (“SIC”) code categories that meet the definition of industrial activity. Id. EPA's definition also includes a narrative description of covered industrial activities, including “industrial plant yards . . . material handling sites . . . sites used for the storage and maintenance of material handling equipment . . . shipping and receiving areas . . . storage areas . . . for raw materials . . . and areas where industrial activity has taken place in the past and significant materials remain.” Id. However, courts have recognized at least one exception the Ninth Circuit has determined that SIC Code 4911 for electrical services does “not appear to be included or implicated in [industrial activities under] 40 C.F.R. § 122.26(b)(14).” ERF I, 713 F.3d at 512, n.7.

The State Board is the regulatory body in charge of implementing EPA's regulations and issuing the relevant stormwater permits to dischargers. The State Board's NPDES General Permit fact sheet states that the:

General Permit provides regulatory coverage for all facilities with industrial activities . . . where the covered industrial activity is the Discharger's primary industrial activity. In some instances, a Discharger may have more than one primary industrial activity occurring at a facility.
ECF No. 17-2 at 18 (emphasis added); Eden Env. Citizen's Grp., LLC v. Cal. Cascade Bldg. Materials, Inc., No. 19-cv-1936-TLN-KJN, 2021 WL 4286464, at *5 (E.D. Cal. Sept. 21, 2021). The SIC Manual further explains that whether an activity is “primary” turns on whether “the employment in each such economic activity is significant” and whether “separate reports can be prepared on the number of employees, their wages and salaries, sales or receipts.” ECF No. 18-1 at 84.

PacifiCorp argues that “none of the activities EcoRights alleges constitute the Facility's ‘primary activity' supporting electrical power generation and distribution” that is, SIC Code 4911. ECF No. 45 at 6. PacifiCorp further contends that “EcoRights exaggerates the maintenance activities . . . to create the ‘wholesale distribution of scrap and waste materials' where none exists, vehicle operations to fit its narrative, and oversell[s] the extent of sand and gravel operations, none of which are ‘primary' or even ‘distinct and separate economic activities' for the Facility.” ECF No. 32 at 16.

As PacifiCorp points out, “EcoRights must ‘plausibly' allege that PacifiCorp engages in activity that fits within the 11 specific SIC codes cited in the regulation, 40 C.F.R. § 122.26(b)(14)(i)-(xi), or the 9 categories of facilities the Board has identified as requiring a [] permit.” ECF No. 45 at 6. At the pleadings stage, a plaintiff's factual allegations must be accepted as true. Knievel, 393 F.3d at 1072. The FAC sets forth in detail how the Crescent City Facility may be classified within SIC Codes 5093 (recycling activities), ECF No. 23 ¶¶ 79-81, 4231 (motor vehicle maintenance activities), Id. ¶¶ 82-87, and 1442 (sand and gravel handling activities), Id. ¶¶ 88-89. It also alleges on information and belief that employment and revenue generation in these activities are significant and that these activities constitute “primary industrial” activities. Id. ¶¶ 80, 85-86, 89, 91. PacifiCorp's factual disagreement about the primary activity of the Crescent City Facility is irrelevant at the motion to dismiss stage; PacifiCorp has failed to show that the Crescent City Facility must be classified as SIC Code 4911 by virtue of the provisions of either the CWA or its implementing regulations. Furthermore, the FAC alleges that the Facility falls within the narrative description of industrial activity including a “material handling site” and “storage area for raw materials.” Id. ¶ 92. As EcoRights points out, and the Court agrees, PacifiCorp entirely ignores this alternative narrative basis for permit coverage, thereby effectively conceding this point. ECF No. 39 at 18; Bluestar Genomics v. Song, No. 21-CV-04507-JST, 2023 WL 8852735, at *6 (N.D. Cal. Dec. 21, 2023) (citing Lou v. Am. Honda Motor Co., Inc., No. 16-CV-04384-JST, 2022 WL 18539358, at *2 (N.D. Cal. Aug. 26, 2022)).

EcoRights has plausibly pleaded that the Crescent City Facility may properly be classified under certain SIC Codes or other narrative descriptions. Accordingly, the Court denies PacifiCorp's motion to dismiss on these grounds.

b. Auxiliary Facility

PacifiCorp contends that even if EcoRights alleges primary industrial activities for which a permit is required, its claims under the CWA fail because the Facility is “auxiliary” and therefore exempt from permitting requirements. ECF No. 32 at 17-18.

EcoRights submits evidence from a State Board email to explain how the SIC Manual should be interpreted. ECF No. 39 at 20. PacifiCorp asks this Court to give the State Board's interpretation of the SIC Manual deference under Skidmore v. Swift Co., 323 U.S. 134 (1944). ECF No. 45 at 11. However, as described above, PacifiCorp also filed an objection to EcoRights' inclusion of the Board letter and asked this Court to “ignore all such material.” Id. at n.5. The Court has not considered the Board's interpretation of the SIC Manual.

The SIC Manual defines auxiliaries as:
[E]stablishments [i.e., economic units] primarily engaged in performing management or support services for other establishments of the same enterprise . . . A unit that performs auxiliary functions and is located physically separate from the establishment or establishments served is treated as a separate establishment.
...
The following are examples of auxiliary establishments primarily engaged in performing management or support services for other establishments of the same enterprise:
...
(3) Warehouses and storage facilities primarily serving other establishments of the same enterprise.
(4) Maintenance and repair shops primarily serving other establishments of the same enterprise for the maintenance and repair of its own machinery and equipment.
ECF No. 18-1 at 85-87. “An establishment is not necessarily identical with the enterprise (company) which may consist of one or more establishments.” Id. at 84. The SIC Manual also provides a carve-out for electrical operations:
For activities such as . . . electric, gas, . . . and similar physically dispersed operations, establishments are represented by those relatively permanent main or branch offices, terminals, stations, etc., that are either (1) directly responsible for supervising such activities, or (2) the base from which personnel operate to carry out these activities. Hence, the individual sites, projects, fields, networks, lines, or systems of such dispersed activities are not ordinarily considered to be establishments.
Id. PacifiCorp argues that the Crescent City Facility and its storage and other support functions should be considered “auxiliary” to PacifiCorp's primary industrial activity-supporting the generation and transmission of electrical power, and that the Facility does not need a discharge permit. ECF No. 32 at 17-18. EcoRights proffers two responses. First, that “the ‘individual sites' that do not constitute establishments are the physically dispersed networks or lines, such as PacifiCorp's dispersed electricity lines,” and that the Facility “is not a ‘physically dispersed operation,' but . . . [a] ‘relatively permanent' location that the SIC Manual says can constitute an ‘establishment.'” ECF No. 39 at 19. Second, EcoRights contends that there is a difference between auxiliary “functions” and auxiliary “facilities.” Id. at 19-20. That is, “for a multiactivity facility, each establishment must be analyzed to determine if it is ‘auxiliary.'” Id. If a facility has “more than one establishment, and one is not an ‘auxiliary,' the facility requires General Permit coverage for that non-auxiliary establishment.” Id.

Regardless of how the parties interpret the SIC Manual, ultimately, they disagree about whether there is more than one activity at the Facility. If even one of those activities are properly classified as a primary industrial activity, and not an “auxiliary” to other establishments run by PacifiCorp, then a permit is required. These are factual questions that cannot be resolved at the pleading stage. As described above, EcoRights alleges that “PacifiCorp conducts functions that do not provide support services to its generation and transmission of electrical power” including for example recycling activities, ECF No. 23 ¶¶ 79-81, motor vehicle maintenance activities, Id. ¶¶ 82-87, and sand and gravel handling activities, Id. ¶¶ 88-89. ECF No. 39 at 20. This is sufficient to allege that the Crescent City Facility generates stormwater “associated with industrial activity.”

B. Resource Conservation and Recovery Act

To state a claim under the citizen-suit provision of RCRA, EcoRights must allege that PacifiCorp “(1) has contributed or . . . is contributing to the past or present handling, storage, treatment, transportation, or disposal (2) of any solid or hazardous waste, (3) which may present an imminent and substantial endangerment to health or the environment.” Ctr. for Biological Diversity v. U.S. Forest Serv., 80 F.4th 943, 950 (9th Cir. 2023) (internal quotation marks omitted).

PacifiCorp argues that EcoRights waived its RCRA claims by failing to present them in its initial complaint; and in the alternative that, EcoRights has failed to meet each of the prongs required to state a claim under RCRA. ECF No. 32 at 18-22.

1. Waiver

EcoRights' initial complaint stated that it “does not seek redress for PacifiCorp's violation of the RCRA at the Crescent City Facility . . . Only PacifiCorp's violations of the CWA at the Crescent City Facility are addressed in this Complaint.” ECF 1 at ¶ 9 n.2. PacifiCorp argues EcoRights waived its right to bring a RCRA claim by “affirmatively disclaiming its RCRA claim in its initial Complaint more than ninety (90) days after EcoRights' notice of its intent to sue.” ECF No. 32 at 2, 19. EcoRights responds that at the time of its initial complaint, it believed the Court did not have subject matter jurisdiction over its RCRA claim because it believed the 90-day notice period under RCRA had not elapsed. ECF No. 39 at 22. EcoRights contends that once the notice period elapsed, it timely filed an amended complaint. Id.

PacifiCorp's position is without substance. Federal Rule of Civil Procedure 15(a) provides:

(1) Amending as a Matter of Course. A party may amend its pleading once as a matter of course within:
(A) 21 days after serving it, or
(B) if the pleading is one to which a responsive pleading is required, 21 days after service of a responsive pleading or 21 days after service of a motion under Rule 12(b), (e), or (f), whichever is earlier.
Fed. R. Civ. P. 15(a). The Ninth Circuit views “Rule 15(a)(1)'s ability to amend as a right . . . which is exhausted or limited only by the restrictions set forth in the Rule itself.” Ramirez v. Cnty. of San Bernardino, 806 F.3d 1002, 1007-08 (9th Cir. 2015) (collecting cases finding that a plaintiff has an absolute right to amend once as long as it is timely.) Under RCRA, a citizen plaintiff must give notice to the alleged violator at least 90 days before filing suit under RCRA. 42 U.S.C. § 6972(b)(2)(A).

EcoRights was permitted to amend “as of right” “21 days after” PacifiCorp's motion to dismiss, Fed.R.Civ.P. 15(a)(1)(B), and it did so. PacifiCorp offers no authority in support of its contention that EcoRights waived its RCRA claim by not bringing it in its initial complaint, and the Court rejects the contention. PacifiCorp's motion to dismiss on this ground is denied.

2. Active Storage, Transport, or Disposal of Hazardous Substances

PacifiCorp claims that EcoRights has offered “no allegations that PacifiCorp is engaged in active storage, transport or disposal of hazardous substances, rendering its RCRA claim defective.” ECF No. 32 at 22. EcoRights responds that “PacifiCorp has a ‘measure of control' or is ‘otherwise actively involved' with the handling, storage, treatment, transportation, and/or disposal of the solid waste.” ECF No. 39 at 28.

To state a RCRA claim, a plaintiff must allege that the defendant was “directly connected” to the waste disposal process such as shipping waste to hazardous waste treatment, storage, or disposal facilities. Cal. River Watch v. City of Vacaville, 39 F.4th 624, 632-33 (9th Cir. 2022). Furthermore, RCRA requires more than just hypothetical control to establish contributor liability. Id. at 953 (citing Ecological Rts. Found. v. Pac. Gas & Elec. Co., 874 F.3d 1083, 1101 (9th Cir. 2017) (“ERF II”) (merely identifying tire-tracking (a passive method of waste disposal) as a “potential mechanism” by which a defendant might have contributed to dispersal of wastes, does not establish actual contribution.) That is, EcoRights must allege that PacifiCorp was “actively involved in or [has] some degree of control over the waste disposal process to be liable under [the] RCRA.” Ctr. for Biological Diversity, 80 F.4th at 950.

PacifiCorp does not dispute that “it has some level of control over the Poles at the Facility, but [argues it] is not engaging in waste disposal, or ‘disposal' of any kind. Any waste disposal occurs off-site by another company, and any recycling of the Poles does not, by definition, constitute the disposal of waste.” ECF No. 45 at 16-17. The FAC alleges that PacifiCorp's “use, storage, moving . . . related to the Poles and/or TWW” releases Wood Treatment Waste into the environment. ECF No. 23 ¶¶ 3, 48. This is sufficient to allege that PacifiCorp is actively involved in or has some degree of control over the waste disposal process. The truth of these allegations can be tested at a more appropriate stage of the proceedings. The Court denies PacifiCorp's motion to dismiss on these grounds.

While it is true that materials held for future recycling are not RCRA solid waste, Am. Mining Cong. v. EPA, 824 F.2d 1177, 1190-93 (D.C. Cir. 1987), the solid waste in issue are not the physical poles and TWW, but the Wood Treatment Waste from the Facility.

3. Solid Waste

PacifiCorp alleges that the Wood Treatment Wastes are not solid wastes under RCRA for two reasons: (1) RCRA's solid waste definition excludes industrial discharges which are point sources subject to permits under the CWA and (2) the wood treatment chemicals are still serving their intended purpose and have therefore not been discarded. ECF No. 32 at 20-22.

a. Permitted under CWA

PacifiCorp argues that if the Wood Treatment Mixtures are subject to permits under the CWA, they are excluded from the definition of “solid waste” under RCRA and therefore not regulated under RCRA. ECF No. 32 at 22.

RCRA's definition of solid waste excludes “industrial discharges which are point sources subject to permits under section 1342 of [the CWA].” 42 U.S.C. § 6903(27). In Los Angeles Waterkeeper v. SSA Terminals, LLC, the court found that the complaint failed to “adequately allege that the Facilities discharge non-industrial stormwater constituting solid waste subject to [the] RCRA, as opposed to ‘solid or dissolved material in . . . industrial discharges which are point sources'” subject to the defendants' general permit under the CWA. No. 22-CV-01198-FWS-MRW, 2023 WL 7960773, at *16 (C.D. Cal. Nov. 14, 2023) (internal citations omitted).

PacifiCorp contends that “EcoRights has not distinguished between industrial and nonindustrial stormwater” and that under L.A. Waterkeeper, EcoRights fails to allege sufficient facts to support a “solid waste” regulated under RCRA. ECF No. 32 at 22. EcoRights responds that first, unlike L.A. Waterkeeper, PacifiCorp does not have a preexisting general permit governing the discharges of industrial stormwater and therefore, this exception does not apply. ECF No. 39 at 29-30; ECF No. 23 ¶ 171. Next, EcoRights argues that its complaint makes clear that “(1) the solid waste pollution at issue is not limited to pollution of ‘waters of the United States'; (2) the solid waste pollution at issue is broader than the pollutants regulated under the CWA; and (3) the methods by which such pollutants are released into the environment . . . are not limited to storm water associated with industrial activity.” ECF No. 39 at 30.

At the motion to dismiss stage, it is sufficient to observe that the Facility is not presently subject to any CWA permits as a point source, such that PacifiCorp's motion on this ground must be denied. Also, EcoRights has sufficiently alleged that there is pollution from the Facility that is broader than discharges from a point source. The FAC states how pollutants discharge into the surrounding environment by means other than point source discharges of storm water. First the “toxic Wood Treatment Mixtures Waste from the Poles and TWW travels in storm water to unpaved areas downstream of the Crescent City Facility where it contaminates surface sediments and infiltrates into the ground and groundwater.” ECF No. 23 ¶ 62. Second, the “contamination can further escape the Crescent City Facility when . . . [the] Wood Treatment Mixtures Waste are tracked off of the Crescent City Facility by vehicles, foot traffic, and/or in storm water and/or by wind, leaf blower, sweeping, powerwashing, and/or other natural or artificial processes that are designed to and/or do move material from one area to another.” Id. The Court finds that EcoRights' allegations are sufficient to explain that there are non-point source discharges and other types of pollutants constituting solid waste subject to RCRA.

b. Intended Purpose of Wood Treatment Mixtures

PacifiCorp argues that the Wood Treatment Mixtures are still serving their intended purpose, have not been discarded, and therefore cannot be “solid waste.” ECF No. 32 at 20-21. RCRA defines “solid waste” as:

[A]ny . . . discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations[.]
42 U.S.C § 6903(27). The Ninth Circuit has previously found that “discard” means to “cast aside; reject; abandon; give up.” ERF I, 713 F.3d at 515. The Ninth Circuit reasoned that “like pesticide applied to a field, preservative that falls to the base of a utility pole still serves its intended purpose by inhibiting the growth of vegetation, fungi, and other organisms,” and held that “wood preservative that is washed or blown away from utility poles by natural means, [was] an expected consequence of the preservative's intended use, [and] has [therefore] not been ‘discarded.'” Id. at 516. Accordingly, “[w]hether a product has ‘served its intended purpose and is no longer wanted by the consumer' is a ‘key' consideration in determining whether a substance constitutes solid waste.” Id. at 515.

EcoRights explains in its FAC that the “solid waste” is the discharge of Wood Treatment Wastes “associated with the new, freshly treated utility poles, used treated utility poles or crossarms (collectively, ‘Poles') and treated wood waste (‘TWW') stored at the Crescent City Facility.” ECF No. 23 ¶ 1. TWW, in turn, “means any wood items or fragments thereof that have been treated with any of the Wood Treatment Mixtures but that are not complete Poles and/or crossarms destined for service, which includes, but is not limited to, out of service utility poles, used utility pole segments, out of service cross arms, used cross arm segments, sawdust, splinters, wood chips, and any other wood pieces and/or fragments.” Id. ¶ 2 n.1.

PacifiCorp argues that any spillage or drippage is not discarded product because “the new Poles, destined for installation . . . are not discarded or waste.” ECF No. 32 at 20. PacifiCorp further argues that the Poles stored at the Facility “are currently being used, or will be recycled and then re-used.” ECF No. 45 at 15. EcoRights responds that the Wood Treatment Mixtures “in this case ‘ha[ve] served [their] intended purpose and [are] no longer wanted by' PacifiCorp.” ECF No. 39 at 24.

Under ERF I, the focus of this Court's inquiry is whether the Wood Treatment Mixtures and not the utility poles or TWW have “served [their] intended purpose” and are “no longer wanted by the consumer.” ERF I, 713 F.3d at 515. While some of the poles stored at the Crescent City facility might, as PacifiCorp contends, be “new, freshly treated utility poles,” EcoRights plausibly alleges that some of the wood preservative washes away from “out of service utility poles,” “out of service cross arms,” “sawdust,” “splinters,” and “wood chips.” These materials are clearly alleged to have been “abandoned and cast aside by the facilities' operators,” creating at least a dispute of fact as to whether the TWW is “discarded material.” Cal. River Watch, 39 F.4th at 630. Moreover, it follows logically that because out-of-service utility poles and like materials no longer require wood preservative, the usefulness of the wood preservative left on the TWW is eliminated. See Cmty. Ass'n for Restoration of the Env't, Inc. v. Cow Palace, LLC, 80 F.Supp.3d 1180, 1220 (E.D. Wash. 2015) (“Rather, this Court determined that the issue of whether manure can be considered a solid waste hinges, factually, on whether the manure is handled and used in such a manner that its usefulness as a fertilizer is eliminated.”). The Court will deny PacifiCorp's motion on this ground.

Indeed, Defendants acknowledge in a supplemental brief that “some of the used poles are damaged or have reached the end of their useful life and must be appropriately disposed of in an approved landfill.” ECF No. 75 at 9 (footnote omitted). This supports the conclusion that the wood preservative also is no longer useful.

4. Imminent or Substantial Endangerment

PacificCorp argues that EcoRights has not properly alleged that the California Department of Toxic Substances Control (“DTSC”) or any other regulator has found that the alleged discharges would support a finding of “imminent and substantial” endangerment. ECF No. 32 at 22. EcoRights responds that it “repeatedly alleges imminent and substantial endangerment based on pollution of the Facility itself, pollution of the unfenced lot next door, pollution of the neighborhood, pollution of nearby homes, pollution of nearby businesses, pollution of a nearby cul-de-sac where children appear to play basketball, direct contact with storm water and/or associated pollutants leaving the Facility, and pollution of various riparian areas and other natural resource areas that are not waters.” ECF No. 39 at 30 (citing ECF No. 23 ¶¶ 3, 17, 48-50, 52, 53, 57-63, 68-70, 72-76, 148-54, 156, 157, 159, 161).

PacifiCorp cites no authority requiring that a plaintiff allege that DTSC investigated or issued a notice of violation to show imminent and substantial endangerment to human health or the environment. The Court finds that EcoRights has sufficiently pleaded imminent and substantial endangerment to human health or the environment.

5. Duplicative of Clean Water Act

EcoRights claims that PacifiCorp is violating both the CWA and RCRA based in part on discharge of stormwater runoff from Poles and TWW. PacifiCorp raises for the first time in reply that “EcoRights' position violates RCRA's anti-duplication provision, [42 U.S.C. § 6905(a)] as it would invoke the ‘duplicative regulation' that the provision was intended to preclude.” ECF No. 45 at 19. EcoRights argues in its sur-reply that PacifiCorp “wholly fails to identify any specific statutory requirements imposed by the CWA that are inconsistent with RCRA remedies here.” ECF No. 59 at 6.

The anti-duplication provision of RCRA provides that RCRA will not apply to “any activity or substance which is subject to the Federal Water Pollution Control Act . . ., the Safe Drinking Water Act . . ., the Marine Protection, Research and Sanctuaries Act of 1972 . . ., or the Atomic Energy Act of 1954 . . ., except to the extent that such application (or regulation) is not inconsistent with the requirements of such Acts.” 42 U.S.C. § 6905(a). Accordingly, the Ninth Circuit has held that “[the] anti-duplication provision does not bar RCRA's application unless that application contradicts a specific mandate imposed under the CWA.” ERF II, 874 F.3d at 1095. That is, the application of RCRA must be “incompatible, incongruous, [or] inharmonious” with CWA requirements for the anti-duplication provision to apply. Id. It is the defendant's burden to show that an inconsistency between RCRA and CWA will result if the court does not dismiss the RCRA claim. S.F. Herring Ass'n v. Pac. Gas & Elec. Co., 81 F.Supp.3d 847, 866 (N.D. Cal. 2015).

Other courts have “declined to dispose of RCRA claims based upon [S]ection 6905 at the motion to dismiss stage because ‘discovery is needed to determine if the RCRA and CWA are inconsistent.'” Id. (internal citations omitted). At this stage, PacifiCorp has not shown that any inconsistency between the CWA and RCRA will result from this Court's failure to dismiss the RCRA claim. Accordingly, the Court denies PacifiCorp's motion with respect to anti-duplication.

CONCLUSION

For the reasons described above, the Court denies PacifiCorp's motion to dismiss.

IT IS SO ORDERED.


Summaries of

Ecological Rights Found. v. PacifiCorp

United States District Court, Northern District of California
Jun 26, 2024
23-cv-05179-JST (N.D. Cal. Jun. 26, 2024)
Case details for

Ecological Rights Found. v. PacifiCorp

Case Details

Full title:ECOLOGICAL RIGHTS FOUNDATION, Plaintiff, v. PACIFICORP, et al., Defendants.

Court:United States District Court, Northern District of California

Date published: Jun 26, 2024