East Bay Municipal Utility Dist. v. City of Lodi

District Court of Appeals of California, Third District
Dec 17, 1931
6 P.2d 325 (Cal. Ct. App. 1931)

Opinion

Rehearing Granted Jan. 12, 1932.

Appeal from Superior Court, Calaveras County; J. A. Smith, Judge.

Condemnation proceeding by the East Bay Municipal Utility District against the City of Lodi and another. From a judgment condemning the riparian rights of defendants, defendants appeal.

Affirmed.

COUNSEL

Robt. M. Searls, of San Francisco, Glenn West, of Lodi, and Edw. R. Solinsky, Frank J. Solinsky, Corbet & Selby, and Humphrey, Searls, Doyle & MacMillan, all of San Francisco, for appellants.

Harold Raines, T. P. Wittschen and L. W. Irving, all of Oakland, John Hancock, of Stockton, Jos. R. Huberty, of Woodland, and Chas. P. Snyder, of San Andreas, for respondent.


OPINION

PLUMMER, J.

The plaintiff had judgment in an eminent domain proceeding condemning the riparian rights of the defendants in and to the waters of the Mokelumne river in so far as said rights pertain to the lands and premises described in the plaintiff’s complaint. From this judgment the defendants appeal.

The lands and premises involved comprise about 207 acres situate along the Mokelumne river in Amador and Calaveras counties, are unsuitable for agricultural purposes, are mostly rocky and barren, and are susceptible of being used for grazing purposes only to a limited extent. The lands and premises belonging to the defendants are divided by certain lands and premises belonging to the United States, reserved from entry except for power purposes, and also a certain tract of land belonging to a private owner.

The court found that the lands and premises of the defendants could be used for power purposes by building a dam thereon which would raise the waters of the river, giving a head of not exceeding 43 feet without inundating the lands belonging to the general government, but if the intervening tracts between the lands owned by the defendants were submerged, the waters of the river might be so raised as to give a head of 57 feet.

While not so found, the testimony shows that a head of water to the extent herein mentioned would operate a power plant of some capacity, the extent of which does not satisfactorily appear.

The Mokelumne river has its source in the Sierra Nevada Mountains, approximately 100 miles easterly of the city of Lodi, and flows in a general westerly course to its confluence with the San Joaquin river at a point between 15 and 20 miles from the city of Lodi. During certain seasons of the year it carries a large body of flood waters, occasionally approximating a flow of 60,000 cubic feet per second. Thereafter it rapidly decreases during certain summer months until the flow does not exceed 100 cubic feet per second. Until the year 1923 no action had been taken by the municipality to impound either the natural flow or the flood waters of the Mokelumne river.

For the purpose of utilizing the waters of the Mokelumne river so far as possible to supply the domestic demands of the cities of Oakland, Berkeley, Alameda, Emeryville, Piedmont, Albany, Richmond, and El Cerrito, an election was held on May 22, 1923, for the purpose of organizing the East Bay Utility District, with exterior boundaries including the cities above mentioned. This election resulted in the organization of the plaintiff as a utility district. Investigations were had as to the availability of the waters of the Mokelumne river for the purposes mentioned, and also to ascertain for what power uses said waters might be applied, and thereafter, on November 4, 1924, an election was had authorizing a bond issue in the sum of $39,000,000 for the construction of what was thereafter called the Mokelumne river project. Some litigation followed relative to the validity of the bonds offered for sale by the district, which resulted favorably, and on September 25, 1925, contracts were entered into for the construction of the major units of the project, and actual work was begun. Thereafter, eminent domain proceedings were had, whereby the district secured the use of approximately 8,000 acres of land for use as a reservoir site. These proceedings were had in 1927. For the purposes of impounding the waters of the river and rendering them available for use, the district began the building of a certain dam called the Pardee Dam, and continued work thereon, and at the time of the execution and delivery of a deed by the Colorado Power Company to the city of Lodi, hereinafter mentioned, had expended upon the Pardee Dam, conduits, etc., upwards of $34,000,000, a sum slightly in excess of $15,000,000 thereof having been expended upon the construction of the dam. In addition to this the utility district has expended on tunnels, aqueducts, and acquiring distribution systems an aggregate sum in excess of $64,000,000. Prior to the institution of this suit, no action had been taken with reference to the riparian rights of any owners of land on the Mokelumne river below the site of the Pardee Dam apparently, the contention of the district being that the impounding of the flood waters of the Mokelumne river during the flood season of each year would enable the district to release from its reservoir a quantity of water sufficient in volume that the riparian rights of lower land owners would not be impaired.

Beginning with September, 1926, and ending with July, 1927, one Lloyd Thayer acquired title to the various parcels of land involved in this action, and thereafter organized the Colorado Power Company and conveyed the premises to the company so organized.

During the period of time elapsing between tht commencement of construction work by the utility district and some time in the year 1928, Thayer had some negotiations with the utility district relative to the district advancing a sum in the neighborhood of $100,000 to build a dam for impounding waters upon the lands to which he had acquired title. These negotiations did not result in the district advancing any money, and some time later the Colorado Power Company sent a letter to the utility district in which it was stated that the power company proposed to develop power as a riparian owner, and notified the utility district not to proceed with any construction work that would interfere with the natural flow of the Mokelumne river above the Colorado Power Company’s project. This was three years after work had been begun upon the Mokelumne river project by the utility district, and after the district had expended thereon a sum in excess of $15,500,000.

On the 9th day of January, 1929, so far as the record shows, without any previous negotiations, the Colorado Power Company delivered to the city of Lodi a deed of conveyance signed by Lloyd W. Thayer, as president, and Albert P. Slichter, as secretary, whereby the power company transferred to the city of Lodi, all and singular, the premises described in the plaintiff’s complaint. This deed contains, among other things, the following terms and conditions: "Whereas the grantor and the grantee consider the said premises are adaptable and necessary for the construction thereon and operation of a hydroelectric power plant for the generation of electric energy and the transmission of such energy therefrom to serve the inhabitants of the City of Lodi; and whereas the grantee now owns and operates a municipal electric distribution system adapted to the distribution of electric energy to be generated on the premises hereinafter described by and through the construction and operation of the said power plant, together with the construction and operation of transmission lines connecting the said present distribution system of the City of Lodi with the said hydroelectric power plant: Now, therefore, in consideration of the premises and of the sum of $10 to it in hand paid, the receipt of which is hereby acknowledged, and upon other good and valuable considerations to it thereunto moving, the grantor hereby grants and conveys to the grantee all of that certain property above referred to situate in the counties of Amador and Calaveras, state of California, and more particularly described as follows, to-wit: (Here follows a particular description of the lands and premises, aggregating some 200 acres.) To have and to hold the said premises, and appurtenances unto the grantee, its successors and assigns forever, for public use in the generation and production of electric energy for the use of the inhabitants of the City of Lodi, subject, however, to the following conditions subsequent, the happening of any one of which shall operate to terminate and defeat the title of the grantee in said premises and revest the same in the grantor hereunder." Six conditions are then set forth in the deed, a failure to comply with any one of which would revest title in the grantor. The first condition specified that the grantee should accept the deed, with the conditions, within 10 days after the tender of the same. The second condition, that the grantee should, within one year after the receipt of the deed, cause a final investigation of the engineering features necessary to be made prior to the construction of any power plant, and report the same to the grantor. The third condition specified that the grantee should, within two years from and after the date of the deed, call an election for the purpose of having it determined by the electors of the city of Lodi, whether a bond issue would be authorized to pay the expenses of constructing such hydroelectric plant and transmission lines. The fourth condition specified that the grantee should, within three years from and after the date of the deed, enter into a binding contract with a responsible contractor for the construction of the projected works, including the power plant and transmission line, and notifying the grantor of the awarding of such contract. The fifth provision specified that the grantee should, within four years from and after the date of the acceptance of the deed, have completed a power plant having a rated capacity of 3,000 kilowatts together with a transmission line connecting said power plant with the distribution system owned by the grantee. The sixth condition specified that the grantee should not fail, for a period of three months, to operate the plant, and should cause to be paid to the grantor, in semiannual instalments, a royalty of two mills per kilowatt hour for each kilowatt hour of electric energy generated at said plant, in semiannual payments for 25 years, payments to be made within 30 days after the expiration of each semiannual period; that the payments should never be less than $5,000 semiannual, nor more than $10,000 semiannual, irrespective of the quality of energy delivered, or to the extent to which the plant might be operated. A failure to comply with any of the conditions set forth in the deed would cause the title to revest in the grantor.

At the same meeting of the council, when the deed just referred to was tendered by the representatives of the Colorado Power Company to the city of Lodi, the council adopted resolution No. 567, which contained, among other things, the following: After reciting that in the judgment of the representatives of the company and of the council, the project referred to was economically adapted as a site for the development of a municipally owned electric power plant, the resolution reads: "Whereas, the conditions attached to the tender of the said deed are that the City of Lodi accept the deed, conveying the property of the Colorado Power Company, as hereinafter described, and such title to the said property as the Colorado Power Company now has, subject to certain conditions subsequently expressed in said deed, and that the settlement or dismissal of any litigation now pending, or which may follow the acquisition of title to the said property by the City of Lodi, affecting the riparian rights to the flow of the Mokelumne River through the said property, which rights are part and parcel of the said property, shall be satisfactory in terms to the Colorado Power Company and approved by it; and Whereas, the city council of the City of Lodi believes that the conditions attached to said offer of conveyance are reasonable, do not involve any present heavy commitment to expenditure by the City of Lodi, and should be accepted; Now Therefore, be it, and it is hereby Resolved, that said conditions attached to said tender be, and they are hereby accepted, and that the clerk of this board is hereby authorized and directed to notify said Colorado Power Company, in writing, of such acceptance and to transmit to said company a copy of this resolution; and be it Further Resolved, that the said property so conveyed to the City of Lodi in said deed is hereby appropriated and dedicated to public use, to-wit: as a site for the construction of a reservoir, power-house, bus-yard, operators’ quarters and other appurtenant structures to be designed, constructed and used in the generation of electric energy for the use of the City of Lodi and its inhabitants." The resolution then further authorized the city engineer to make examinations and explorations of the site of the proposed plant, and to report his findings to the council. The city attorney was likewise directed to prepare and submit to the council a report setting forth the legal procedure necessary for the presentation to the electors of the city of Lodi of a plan for financing construction and operation of said works. The city attorney was authorized also to negotiate with the proper state and federal authorities in obtaining permits and licenses necessary and expedient. The city attorney was also authorized to take such steps to prosecute or defend any litigation which might be necessary for the protection of the rights of the city of Lodi in and to the riparian flow of the waters of the Mokelumne river; also to protect the contingent interests of the power company. It was further provided that none of the litigation should be settled without the consent of the power company. It was further provided that the rights of the city of Lodi acquired under the deed should not be transferred without the consent of the power company, other than to a water district organization, to include the city of Lodi. It was further provided that in the event of any adverse proceedings being taken and had, and the title to the premises or the riparian rights transferred to or vested in any adverse party, that the amount of damages awarded therefor should be first applied to the repayment of any expenses and costs incurred by the city of Lodi, and the surplus, if any, divided between the city and the power company in the following proportions: 75 per cent. to the power company and 25 per cent. to the city of Lodi.

The record shows that the instruments just referred to were presented to the city council of the city of Lodi on the evening of the 9th of January, 1929, by representatives of the power company, and the proceedings then had included the delivery of the deed in the passage of the resolution referred to and the authorization of the institution of injunction proceedings against the utility district. The mayor of the city of Lodi testified that no consideration was paid by the city of Lodi, no bond election had been called up to the time of the trial of this action, and practically no further proceedings had been taken and had, other than of a very limited exploration made of the premises by the city engineer, or an engineer employed for that purpose.

It appears also from the record that the council was advised that their position in the pending litigation, which litigation involved the water level in the wells from which Lodi derived its water supply, would be strengthened by going into the Colorado deal. No investigation was made as to the purchase price of the premises involved, paid by Thayer, which the record shows aggregated the sum of $9,475. The representatives of the power company in explaining the project to the council did not state how much the project would cost, nor was the purchase price of the premises mentioned. Mr. Thayer never informed the council as to the amount of money he had paid for the lands included in the deed, nor was anything said as to what the Colorado Power Company had paid therefor. The record shows that no application was ever made to the Federal Power Commission to use the lands owned by the federal government. It was further shown that it was the intent of the council to meet the expense of the project by a bond issue. The record further shows that an election was held to organize a water district which included the city of Lodi, and the project was voted down. The record further shows that the city of Lodi did not have in its treasury sufficient funds to finance the project; that a bond issue would be necessary; and that the bonds of the city of Lodi already outstanding were so great in amount as to render improbable that a bond issue could be voted sufficient to defray the expense of the building of the dam, the hydroelectric plant and the transmission line, without violating the constitutional provision limiting the indebtedness of the city to a certain percentage of the assessed valuation of the property within its corporate limits.

With this summary in view, only one vital question is tendered for consideration, to wit: Were the circumstances and transactions connected with the property involved such as to render the same immune as against eminent domain proceedings under the last sentence of subdivision 4 of section 1240, Code of Civil Procedure, which reads: "but property appropriated to the use of any county, city and county, incorporated city or town or municipal water district, may not be taken by any other county, city and county, incorporated city or town, or municipal water district, while such property is so appropriated and used for the public purposes for which it has been so appropriated." This language implies that the property to be rendered immune must not only be appropriated, but also used for a public purpose. As construed by the authorities which we shall hereinafter cite, the word "used" does not mean actual physical use at the date of the institution of the condemnation suit, but means property reasonably necessary for use, and which the circumstances reasonably show will be actually used within a reasonable length of time. If the use is contingent, uncertain or problematical, or not reasonably definite as to time, eminent domain proceedings are not barred. If the circumstances disclosed upon the trial of the cause are such as to justify the trial court in concluding that the projected use is contingent, uncertain, problematical, or not reasonably definite as to time, then and in that case an appellate court has no power to interfere, unless error otherwise appears in the trial, necessitating a reversal.

In the consideration of the questions presented and determined by the trial court it must be remembered that the water supply of the city of Lodi is not involved, and that the city of Lodi was already being supplied with electric power for use over its distributing system. In arriving at a conclusion the court had for its consideration the fact that a proposed water district to be organized for the purpose of protecting the water supply of the district which included the city of Lodi, had already been voted down; that the contingencies set forth in the deed of conveyance executed and delivered by the power company, rendered the title of the city of Lodi all the while more or less contingent and subject to loss; that the city of Lodi had no money in its treasury to finance the project; that a resort to taxation to raise the necessary funds to defray the expenses of the undertaking would impose a very heavy burden; that in order to float a bond issue covering the cost of the undertaking would require a two-thirds vote of the electors of the city of Lodi; that no such election had been called, although nearly two years had elapsed between the receipt of the deed and the trial of this cause; that the resolution adopted by the city of Lodi recited, among other things, that the city was not committing itself to any heavy expenditures; that the deed was accepted and the resolution for appropriation adopted, without any previous exploration of the project, without any ascertainment of its proposed cost, and any definite knowledge or information had in relation thereto, or as to whether the city of Lodi, even though willing, could legally incur the necessary expenditure. Likewise, the resolutions indicated that no immediate use was contemplated, and that the council at the time of passing the resolution, was not definitely committing the city of Lodi to any expenditure of money, or to any obligations whatever to the public with regard to the projected works, but had in mind that it would aid the city in its contest to conserve its underground supply of water and at least enable the city to share in whatever recovery might be had in the way of damages in the event that the use of the waters of Mokelumne river for power purposes by the city or the power company should be subjected to the uses of the utility district by eminent domain proceedings. The findings of the trial court were and are to the effect that the lands involved in this action are bare and unimproved, and were not, on the 9th day of January, 1929, or at any other time, dedicated to any public use, and were not, and are not in process of being put to any public use, and that the city of Lodi has not been proceeding, with reasonable or any diligence to put said lands or any part thereof, or of any water rights appurtenant thereto, to any beneficial use. The court further found that the waters of the Mokelumne river could be utilized by the plaintiff to the extent and for the purposes proposed by the plaintiff without destroying the adaptability or feasibility of the lands of the defendants for power purposes. The court further found that if the lands and premises of the defendants were depreciated in value to any extent, such depreciation did not exceed the sum of $10,000, which sum was allowed as compensation for damages on account of the subjection of the riparian rights appurtenant to the lands involved being subjected to the uses of the plaintiff in this action. The trial court also found that the amount of the bonded indebtedness which would be required to construct the power project and transmission line, in addition to the amount of the present outstanding bonded indebtedness of the city of Lodi, would exceed 15 per cent. of the total assessed valuation of the property within the limits of the city.

In support of their appeal the appellants cite a number of cases to the effect that property appropriated to public use by one municipality cannot be taken by condemnation proceedings for the uses and purposes of another municipality. This, of course, is in accordance with the statutory law of this state. The cases cited, however, are distinguishable from the circumstances here presented.

In the case of Mono Power Company v. City of Los Angeles (C. C. A.) 284 F. 784, cited as controlling here, the facts show that the Southern Sierras Power Company, to which the property had been conveyed, was engaged in the transmission of power to a number of different cities; that while the Southern Sierras Power Company had only recently acquired the property in dispute preceding the institution of eminent domain proceedings by the city of Los Angeles, it was proceeding to utilize the property, and there were not any contingencies relative to either the immediate or prospective uses of the property by the power company. The means, the ability, the immediate and actual use, were all present to support the rights of the power company, and to render the property being used immune as against any condemnation proceedings. In other words, there was both appropriation and use, complying strictly with the requirements of subdivision 4 of section 1240, Code of Civil Procedure.

In State ex rel. Union Trust & Savings Bank et al. v. Superior Court of Spokane County et al., 84 Wash. 20, 145 P. 999, 149 P. 324, as appears from the opinion, the findings of the trial court and the record show that the property acquired was held for future use, and the court said, quoting from the syllabus: "A corporation constructing a hydroelectric power plant for a public purpose cannot condemn a power site owned by another public utilities corporation which intends to construct thereon a similar power plant, since property owned by a corporation and devoted to a public use cannot be condemned by another corporation for use in the same manner and for the same purpose." Here, again, are no circumstances showing the future use to be problematical.

The case of Marsh Mining Co. v. Inland Empire Mining & Milling Co., 30 Idaho, 1, 165 P. 1128, is simply to the effect that eminent domain proceedings will not enable one claimant to condemn property where the condemnor is merely seeking to subject the property to similar uses to which it is already being applied.

In State ex rel. South Fork Log Driving Co. v. Superior Court, etc., 94 Wash. 691, 163 P. 15, the Supreme Court of Washington held that property not presently actually devoted to a public use, but purchased and held by a public service corporation in reasonable anticipation of future needs, is deemed devoted to a public use. Here, again, enters a question of fact to be determined by the trial court as to whether the property has been acquired, and is being held in reasonable anticipation of future use, upon which determination of fact, if supported by the testimony, the finding of the trial court cannot be disturbed.

The case of Nicomen Boom Company v. North Shore Boom & Driving Co., 40 Wash. 315, 82 P. 412, involved the question of abandonment of property after having been acquired, which differentiates everything said in the opinion in that case from the circumstances here presented.

In 20 C. J. 601, the law is thus stated: "Land owned by a corporation whose business constitutes a public use, not in actual use nor essential to the exercise of its franchise, stands on the same footing as that of a private individual, and may be condemned by another corporation under the general laws. Nevertheless, there must be a liberal consideration of the future, as well as the existing needs of the company whose land is sought to be appropriated, before it can be deprived of any portion thereof; but the mere possibility that the land sought to be taken may at some future time become necessary to the exercise of the franchise of the company owning it, does not exempt it from condemnation." Again, the facts and circumstances surrounding the case must be considered in determining the application of this statement of the law as to the possibilities and contingencies relating to the use, and whether the owner possesses the ability to devote the same to a public use, and whether the conditions are such as to make the public use contingent and problematical.

We do not find anything in the case of Los Angeles v. Los Angeles Pacific Co., 31 Cal.App. 100, 159 P. 992, applicable here.

In Vermont Hydro-electric Corporation v. Dunn, 95 Vt. 144, 112 A. 223, 225, 12 A. L. R. 1495, a case cited by appellants and also by respondent, we find a very full statement of the law and citation of authorities which we think amply sustains the judgment of the trial court in this action. It is there shown that there must be a reasonable probability of use of the property, within a reasonable time; that the exemption does not apply if the use is indefinite and uncertain; and that it must be used without any unreasonable delay. The opinion in this case is so full and complete that we quote therefrom extensively as follows: "It is the settled law of this state that property already legally approriated to a public use cannot be taken for another public use without legislative authority expressly given or necessarily implied. Rutland-Canadian R. Co. v. Central Vermont R. Co., 72 Vt. 128, 133, 47 A. 399; Rutland R., Light & P. Co. v. Clarendon Power Co., 86 Vt. 45, 50, 44 L. R. A. (N. S.) 1204, 83 A. 332. To bring property within the immunity from condemnation under general legislative authority it is not necessary that it be acquired by eminent domain. If its owner has devoted it to a public use which he is under a legal obligation to maintain, it comes within the protection of the rule. 2 Nichols on Em. Dom. § 364; 2 Lewis on Em. Dom. (3d Ed.) § 443; Rutland R., Light & P. Co. v. Clarendon Power Co., supra; Barre R. Co. v. Montpelier & W. River Co., 61 Vt. 1, 4 L. R. A. 785, 15 Am. St. Rep. 877, 17 A. 923; In re Saratoga Ave., 226 N.Y. 128, 123 N.E. 197. And it is not necessary that the property be actually in use for the public purpose to exempt it from the proceeding. In other words, it may be appropriated or devoted to a public use within the law of eminent domain without being actually put to such use. Rutland R., Light & P. Co. v. Clarendon Power Co., supra; In re Newport Ave., 218 N.Y. 274, 112 N.E. 911; New Haven Water Co. v. Wallingford, 72 Conn. 293, 44 A. 235. But a mere voluntary assumption of public service which may be abandoned at any time does not carry with it the privilege of exemption. The test whether land is held for a public use such as will exempt it from condemnation is said not to be what the owner does or may choose to do, but what under the law he must do, and whether a public trust is impressed upon it. A corporation does not so hold its property impressed with a trust for the public use, unless its charter or the general law puts that character upon it so that it cannot be shaken off. In re New York L. & W. Co., 99 N.Y. 12, 1 N.E. 27. While land kept by a corporation bound by law to serve the public in reasonable anticipation of future needs cannot be seized for a different public use under general authority, land held for purposes other than those pertaining to its franchise may be taken as freely as from a private individual. 2 Nichols on Em. Dom. § 364, and cases there cited. The element of necessity plays an important part in the determination of the question. While liberal consideration should be given to the future as well as the existing needs of the corporation, the exemption will not extend to property held for future use upon the mere possibility that it may at some future time become necessary to the exercise of its corporate franchise. Reasonable expectation of future needs is required to protect the property from condemnation. Scranton Gas & Water Co. v. Delaware, L. & W. R. Co., 225 Pa. 152, 73 A. 1097; Goldfield Consol. Mill. & Transp. Co. v. Old Sandstorm Annex Gold Min. Co., 38 Nev. 426, 150 P. 313; Cincinnati, S. & C. R. Co. v. Belle Centre, 48 Ohio St. 273, 27 N.E. 464; 20 C. J. 601. The court must deal with conditions that exist at the time condemnation is asked. Kansas & T. Coal R. Co. v. Northwestern Coal & Min. Co., 161 Mo. 288, 51 L. R. A. 936, 84 Am. St. Rep. 717, 61 S.W. 684. Nor is the exemption indefinite in point of time, but the property must be subjected to the use for which it is held within a reasonable time. Denver Power & Irrig. Co. v. Denver & R. G. R. Co. [Denver Power & Irrig. Co. v. Colorado & S. R. Co.], 30 Colo. 204, 60 L. R. A. 383, 69 P. 568; East Hartford Fire Dist. v. Glastonbury Power Co., 92 Conn. 217, 102 A. 592. The general rule to be gathered from the authorities is that property is devoted to or held for a public use, so as to be exempt from condemnation for a different public use under general authority, when used in immediate and necessary connection with a public trust, or when acquired by a public service corporation for a necessary purpose pertaining to its franchise and held in reasonable anticipation of its future needs, with a bona fide intention of using it for such purpose within a reasonable time. For additional cases see State ex rel. Union Trust & Sav. Bank v. Superior Court, 84 Wash. 20, 145 P. 999, 149 P. 324; State ex rel. South Fork Log Driving Co. v. Superior Court, 94 Wash. 691, 163 P. 15; St. Louis, A. & T. H. R. Co. v. Belleville City R. Co., 158 Ill. 390, 41 N.E. 916; In re Rochester H. & L. R. Co., 110 N.Y. 119, 17 N.E. 678. It follows that to sustain the plaintiff’s claim that the property in question is held devoted to a public use, it should appear that it is reasonably necessary to a proper discharge of the plaintiff’s legal obligation to the public, and that in good faith it intends to use the property for such purpose without unreasonable delay. These are largely questions of fact to be inferred from the circumstances under which the property is held."

Again, as shown by the case of State v. Chehalis Boom Co., 82 Wash. 509, 144 P. 719, 721, mere ownership of property by a public service corporation does not render it immune from condemnation. We quote therefrom the following: "The mere fact of ownership of this property by respondent, even though it is a public service corporation, is no impediment to the acquisition of such property through eminent domain proceedings by relator. It is not the mere ownership of property by a public service corporation that protects it from acquisition by another public service corporation seeking to acquire it for a public use by right of eminent domain; but the question of such a right of acquisition must find its answer in the present or prospective use of such property," etc. In that case it appears that the court there was authorized to weigh the comparative advantages flowing to the public by the ownership of the condemnor and condemnee. This, of course, does not enter into the consideration of the case before us. The opinion from which we have quoted cites a number of cases to support the rule just stated.

To the same effect is the case of Borough of Florham Park v. Borough of Madison, 77 N.J. Law, 260, 72 A. 4, where it is said: "Immunity from condemnation accorded to lands held by any municipality for the purposes of a water supply * * * is not created by the mere execution and delivery of a deed of lands to a municipality for such uses, and the acceptance of the same by the common council of such municipality." The same ruling was had in the same case upon a subsequent hearing. 78 N.J. Law, 446, 78 A. 753. To the same effect is the case of East Hartford Fire Dist. v. Glastonbury Power Co., 92 Conn. 217, 102 A. 592, where the Supreme Court of Connecticut held that the mere ownership of property did not exempt it from condemnation proceedings. See, also, Indiana Power Co. v. St. Joseph, etc., Power Co., 159 Ind. 42, 63 N.E. 304, 64 N.E. 468.

The respondent urges the fact that the appellants stood by for a number of years, to wit, from some time in 1923, until shortly before the institution of these proceedings, made no objection to the work being done by the utilities company, and negotiated to the extent which we have mentioned on the part of Thayer and the power company, and also that the city of Lodi had made inquiries as to obtaining electric power from the power plant of the utility district, and that they are equitably estopped, citing in support thereof a number of cases, two of which we will mention: Collier v. Merced Irrig. District, 2 P.2d 790, decided by the Supreme Court, August 31, 1931; and the case of Gravelly Ford Canal Co. v. Pope & Talbot Land Co., 192 Cal. 4, 218 P. 405. However, these cases and others cited by the respondent in support of estoppel, we think, are not wholly applicable, the holding in these cases being that an injunction will not be allowed to a property owner who has stood by until after great sums of money have been expended in the construction of the power or irrigation project, and that damages only will be allowed. What is said in those cases, however, is pertinent to be considered by the trial court in determining the questions of fact to which we have heretofore referred, as to whether the appellants were or were not complying with the requisites of section 1240, Code of Civil Procedure, as to the purposes and uses of the property, and as to the purposes of the conveyance of the property by the Colorado Power Company to the city of Lodi.

We do not find anything in the case of City of San Diego v. Cuyamaca Water Co., 209 Cal. 105, 287 P. 475, affecting any rule of law hereinbefore stated.

Objection is made by appellants relative to the ruling of the trial court as to the admission and rejection of testimony, it being insisted that the testimony relative to the financial condition of the city of Lodi, its bonded indebtedness, and whether it could or could not legally float an additional bonded indebtedness to construct the projected works, was erroneously admitted. With this contention we cannot agree, as such testimony bore directly upon whether the city of Lodi either would or could make any immediate use for power purposes of the property involved in this action, or whether such use was only remote and problematical. Likewise, the ruling of the court excluding protests against the building of the Pardee Dam by others than the appellants herein was unquestionably correct. Some of the findings of the trial court appear to us to be immaterial as contended by the appellants, but whether correct or incorrect, they do not affect the vital questions involved herein.

Appellants also contend that the trial court erred in fixing the damages allowed. However, our attention has not been called to any testimony which really supports such contention. On the part of the respondent testimony was introduced to the effect that there were no substantial damages, and that the market value of the property involved would not be decreased by the construction of the work of the utility district in carrying out its plans of operation. These witnesses testified that the value of the land under the natural flow of the river was considerably less than the damages allowed by the court. The testimony of these witnesses varied from $5,175 to $7,595. On the part of the appellants witnesses were introduced who testified that the value of the property, including its riparian rights, was approximately $300,000. At the conclusion of the cross-examination of the witnesses referred to, motions were made to strike out the testimony of these witnesses. These motions were timely interposed but we have not been pointed to anything in the record indicating the ruling of the court on these motions. However, the findings of the court and the judgment show that the estimates of these witnesses were disregarded. That the court was correct in so doing appears from an examination of the basis upon which the estimates were made. A reference to the testimony of one or two of the witnesses for the appellants will show that no proper basis was laid for estimating the damages. Question to the witness Herman: "Your $290,000.00 you arrived at in this way: You calculated how much it would cost to build a dam; how much it would cost to put in a power plant; how much it would cost to operate it; then you capitalized the value of the land and gave it a certain percentage? A. I capitalized the values that were there." This witness further testified that he arrived at his value by assuming that the plant would cost $363,300, and that the sale output of energy would be at the rate of 4 1/2 mills per kilowatt, and then capitalized this net profit at 8 per cent., and the sum which invested at 8 per cent. would yield the amount of net profit was the sum which he fixed as the market value. The witness Grunsky placed the value at $360,000, approximately $1,800 per acre, and answered the question as follows:

"Q. Your method of arriving at that valuation is to capitalize the returns that would be secured from the revenue of the power generated at this plant after you took out the expenses of building the plant? A. That is one method that was considered.

"Q. What other method did you use? A. Perhaps I should answer that question this way: That I considered a number of different conditions of sale in the manner that you have indicated.

"Q. Mr. Grunsky, I would like a direct answer to this if you will. You said that was one method. If there is any other method that you use, will you please state it? A. Well, that is the method.

"Q. That is the only method? A. That’s right."

The other expert witnesses all based their calculations upon capitalizing the investment, figuring the returns, possible sales, etc. That the testimony of witnesses who based their estimate of values upon estimated profits, capitalizing the investment, etc., furnishes no legal basis for fixing damages, is a settled law of this state, in support of which we need only cite the cases of City of Stockton v. Vote, 76 Cal.App. 369, 244 P. 609, and East Bay Municipal Utility District v. Kieffer, 99 Cal.App. 240, 278 P. 476, 279 P. 178, and the authorities there cited.

The respondent makes the point that under the cases of Chester v. Carmichael, 187 Cal. 287, 201 P. 925, and Mahoney v. San Francisco, etc., 201 Cal. 248, 257 P. 49, and authorities there cited, the deed of the Colorado Power Company to the city of Lodi is void, but from what we have said, it does not appear necessary to determine this question; nor is it necessary to express any opinion as to the validity or invalidity of section 11 of the Water Commission Act (as amended by St. 1923, p. 124) wherein the Legislature purports to abrogate riparian rights on account of nonuser.

Other questions have been tendered and considered, but not being such as to affect the decision herein, are not mentioned in detail. We may add, however, that we find nothing in the case which would warrant the application of the apportionment provisions contained in subdivision 4 of section 1240, Code of Civil Procedure.

The judgment of the trial court is affirmed. Costs awarded appellants.

We concur: PRESTON, P. J.; THOMPSON, J.


Summaries of

East Bay Municipal Utility Dist. v. City of Lodi

District Court of Appeals of California, Third District
Dec 17, 1931
6 P.2d 325 (Cal. Ct. App. 1931)
Case details for

East Bay Municipal Utility Dist. v. City of Lodi

Case Details

Full title:EAST BAY MUNICIPAL UTILITY DIST. v. CITY OF LODI ET AL.[1]

Court:District Court of Appeals of California, Third District

Date published: Dec 17, 1931

Citations

6 P.2d 325 (Cal. Ct. App. 1931)