From Casetext: Smarter Legal Research

Davidson County v. Beauchesne

Court of Appeals of Tennessee. Middle Section
Aug 2, 1955
39 Tenn. App. 90 (Tenn. Ct. App. 1955)

Summary

noting that “if the cause of action had not accrued[, then] the suit was premature”

Summary of this case from Allen v. Fait

Opinion

January 18, 1955. Petition for Certiorari denied by Supreme Court, August 2, 1955.

1. Boundaries.

Designation in deed of quantity of land conveyed was required to yield to calls for lines and monuments surveyed and marked on the ground.

2. Estoppel.

Where deed of strip of realty to county for widening highway recited that consideration received by grantor was entire and covered strip of realty conveyed, grantor was estopped by deed to maintain suit against county to recover for strip, on ground that consideration paid to grantor was for other realty.

3. Estoppel.

Estoppels are by record, by deed, and by matter in pais.

4. Estoppel.

Estoppel by deed is a bar, which precludes one party to a deed and his privies from asserting as against the other party and his privies any right or title in derogation of the deed or from denying the truth of any material facts asserted in it.

5. Estoppel.

A fact admitted by recital, or directly in a covenant or deed, concludes all the parties to it, and cannot be averred against.

6. Estoppel.

Estoppel by warranty is based on fundamental principles of giving effect to grantor's manifest intention appearing on the deed, as to lands or estate to be conveyed, and of preventing grantor's derogating from or destroying his own grant by any subsequent act.

7. Eminent Domain.

Beginning of work of proposed internal improvement within meaning of statute providing that suit by landowner, whose land is taken under power of eminent domain without condemnation proceedings, shall be commenced within 12 months after land has been actually taken possession of, and work of proposed internal improvement begun, does not mean beginning of construction or work on road, but means a number of things preparatory to the construction, such as plans and specifications, surveys, laying off right-of-way, or clearing it of obstructions preparatory to beginning the grading or construction (Code, Secs. 3131, 3132).

8. Statutes.

Statute giving landowner a remedy when his land is taken under power of eminent domain without condemnation proceedings, and giving him right to sue when taker has actually taken possession of the land, occupying it for purposes of internal improvement, and statute providing that such a suit shall be commenced within 12 months after land has been actually taken possession of, and work of proposed internal improvement has been begun, must be read together (Code, Secs. 3131, 3132).

9. Eminent Domain.

Questions of what amounts to a taking within meaning of statute providing that suit by landowner, whose land has been taken under power of eminent domain without condemnation proceedings, shall be commenced within 12 months after the land has been actually taken possession of, and work of proposed internal improvements has been begun, and when the taking is completed so as to give rise to a cause of action and start running of one-year statute of limitations, depend on the facts in each case (Code, Secs. 3131, 3132).

10. Eminent Domain.

Where taking of strip of realty by county for widening of highway was on or about November 21, 1950, owner's suit, which was commenced April 2, 1953, to recover from county for strip of realty, was barred by one-year statute of limitations (Code, Secs. 3131, 3132).

FROM DAVIDSON.

Grantor brought action against county to recover for strip of realty which grantor had conveyed to county for widening highway. The Circuit Court of Davidson County, Byrd Douglas, J., entered judgment adverse to county, and county appealed in error. The Court of Appeals, Felts, J., held that suit was barred by both estoppel by deed and by one-year statute of limitations.

Judgment reversed, suit dismissed, and costs adjudged against grantor.

Elmer D. Davies, Jr., of Nashville, and O.L. Peeler, of Camden, for plaintiff in error.

R.H. Polk, of Nashville, for defendant in error.


This action was brought by Mrs. Alice Crook Beauchesne against Davidson County to recover for a strip of land 30 feet wide and 53 feet long which she alleged the county "did enter upon and appropriate for its own use", without compensating her therefor, and which was acquired by the county for the use of the State in the widening and reconstruction of the Nolensville Pike. There was a verdict and judgment for plaintiff for $793.

The county appealed in error and insists: (1) that plaintiff can not recover for this 30-foot strip of land, because she conveyed it to the State for highway purposes some two years before bringing this suit; and (2) that the suit is barred by the one-year statute of limitations, Code Section 3132.

The county presented these defenses first by demurrer and again by motion for a directed verdict.

(1) In 1950 the State, acting through its Highway Department, undertook to widen and reconstruct the Nolensville Pike, which is State Highway No. 11. Its employees went upon the ground, surveyed, and staked out the right-of-way for this work; and Davidson County acquired this right-of-way for the State, by deeds from the landowners in some cases and by condemnation suits in others.

The county acquired the right-of-way from plaintiff by deed dated November 21, 1950. Her lot, located some miles south of the city limits of Nashville, fronted 53 feet on the east side of Nolensville Pike. By this deed she conveyed to the State a right-of-way in a strip of land described as follows:

"* * *, the land described below, located by a survey heretofore made and staked out, and shown on plans on file in the office of the Department of Highways and Public Works at Nashville, Tennessee. Said land hereby conveyed is located in the ____ Civil District of Davidson County, Tennessee, and the description of the same with reference to said survey and as shown on said plans is as follows:

"A strip of land extending from Survey Station 573+99 at the boundary line of the lands of Lee, to Station 574+52 at the boundary line of the lands of Coleman, 53 feet along, and bounded on the sides as follows:

"On the north by the lands of Coleman, on the South by the lands of Lee; on the west by the present highway; on the east by a line east of, parallel to and 40 feet from the center line of said proposed highway as staked out; containing 1,312 square feet. The State will construct concrete steps from the back of the sidewalk to the top of the bank."

Thus the land described and conveyed was a rectangle bounded "on the north by the lands of Coleman; on the south by the lands of Lee; on the west by the present highway; on the east by a line east of, parallel to, and 40 feet from the center line of said proposed highway as staked out". (Italics added.) That is, the right-of-way conveyed included all land west of this east line — all between that line and the highway.

This embraced the 30-foot strip in suit and other land off the front of plaintiff's lot. This 30-foot strip was part of an abandoned street railway right-of-way, lying between the front of her lot and the Nolensville Pike, as formerly located. Owners of lands bordering on this strip claimed it had reverted to them, while the county claimed it had been dedicated for highway purposes. Later in another case, this controversy was determined in favor of the landowner. McKinney v. Davidson County, 194 Tenn. 689, 254 S.W.2d 975, noted in 6 Vand. L. Rev. 1089.

It was apparently because of this controversy, existing when this deed was made, that the deed stated the quantity as 1,312 square feet, when in fact the area conveyed was actually much larger than that. But this designation of quantity must yield to the other more reliable descriptive particulars — the calls for lines and monuments surveyed and marked on the ground. 16 Am. Jur., Deeds, Sec. 289, p. 601; 8 Am. Jur., Boundaries, Sec. 63, p. 790; Staub v. Hampton, 117 Tenn. 706, 101 S.W. 776.

As we understand, plaintiff does not claim that her deed did not include and convey this 30-foot strip. Her claim, as set forth in her amended declaration (Tr. p. 7), is that while she did convey this strip she was not paid for it but for the other land conveyed; that the consideration for the deed, $1,200, was paid for the other land and not for this strip; and that she is, therefore, entitled to recover for it.

This deed, however, shows that the consideration was entire and covered all the land conveyed, including this 30-foot strip. The deed recites: "This conveyance is made in consideration of the sum of twelve hundred ($1,200.00) * * * and said sum is in full payment for said above described right-of-way and for all damages which may be done to the remainder of * * * land by the construction of a highway upon said right-of-way".

We think plaintiff was estopped by her deed to maintain this suit or to deny the above recital. Estoppels are three kinds: (1) by record, (2) by deed, and (3) by matter in pais. "Estoppel by deed is a bar which precludes one party to a deed and his privies from asserting as against the other party and his privies any right or title in derogation of the deed or from denying the truth of any material facts asserted in it." 19 Am. Jur., Estoppel, Sec. 6, p. 603.

"`A fact admitted by recital, or directly in a covenant or deed, concludes all the parties to it, and cannot be averred against.' Henderson v. Overton, 10 Tenn. 394-397, 24 Am. Dec., 492." Battle v. Claiborne, 133 Tenn. 286, 302, 180 S.W. 584, 588.

"`Estoppel by warranty is based on the fundamental principles of giving effect to the manifest intention of the grantor, appearing on the deed, as to the lands or estate to be conveyed, and of preventing the grantor's derogating from or destroying his own grant by any subsequent act.' Condit v. Bigalow, 64 N.J. Eq. 504, 54 A. 160." Battle v. Claiborne, supra, 133 Tenn. 303, 180 S.W. 588.

(2) We also think this suit was barred by the one-year statute. The declaration alleged that "on or about the 21st day of November 1950, the defendant did enter upon and appropriate for its own use" this 30-foot strip, "without compensating plaintiff therefor". The suit was commenced April 2, 1953, or more than twelve months after the taking or expropriation.

The suit was brought under Code Section 3131, which provides the landowner a remedy when his land is taken under the power of eminent domain without condemnation proceedings. This section gives him a right to sue when the taker "has actually taken possession of such land, occupying it for the purposes of internal improvement."

Code Section 3132 provides that such a suit shall be commenced "within twelve months after the land has been actually taken possession of, and the work of the proposed internal improvement begun", with a saving of a further period to unknown owners, non-residents, and persons under disability, not here material.

For plaintiff it is argued that in order to start the running of the statute, two things must take place: (1) there must have been a taking, and (2) the work of the internal improvement must have begun; that though the taking here was in November 1950 "the work on the road did not begin until January 1954, long after this suit was filed"; and that, therefore, the statute had not begun to run when the suit was brought.

We can not follow this argument. The statute begins to run when a cause of action accrues; and if, as plaintiff contends, the statute had not begun to run before the suit was brought, it would necessarily follow that the cause of action had not accrued and the suit was premature.

And the beginning of "the work of the proposed internal improvement" would not mean the beginning of the construction or "the work on the road", as plaintiff contends, but might mean any one of a number of things preparatory to the construction, such as the plans and specifications, surveys, laying off the right-of-way, or clearing it of obstructions preparatory to beginning the grading or construction.

We think Sections 3131 and 3132 must be read together. Under the former, the right of action accrues when the taker "has actually taken possession of such land, occupying it for the purposes of internal improvement". Under the latter, the suit must be brought "within twelve months after the land has been actually taken possession of, and the work of the proposed internal improvement begun".

The above quoted words are similar in both sections. Under 3131, the actual taking possession of the land, occupying it for purposes of internal improvement, marks the act of taking or expropriation, upon which the right of action accrues; and under 3132, the actual taking possession of the land, and the beginning of the work of the proposed internal improvement, fixes the time when the statute starts to run.

The questions of what amounts to a taking in a particular case, and of when the taking is completed so as to give rise to a cause of action and start the running of the statute of limitations, depend on the facts in each case.

But there is no such question in this case. The facts are not in dispute. The taking was on or about November 21, 1950. This was the date alleged in plaintiff's declaration, and the date shown by her proof. Having been brought more than twelve months after that date, this suit was barred. Doty v. American Telephone Telegraph Co., 123 Tenn. 329, 347, 130 S.W. 1053; Central Realty Co. v. City of Chattanooga, 169 Tenn. 525, 531, 89 S.W.2d 346; Chumbley v. State, 183 Tenn. 467, 469, 192 S.W.2d 1007.

In view of our conclusion above stated, that the suit is barred by both estoppel and the statute, we need not discuss other questions raised by the county. The judgment of the Circuit Court is reversed, the suit dismissed, and the costs are adjudged against plaintiff.

Howell and Hickerson, JJ., concur.


Summaries of

Davidson County v. Beauchesne

Court of Appeals of Tennessee. Middle Section
Aug 2, 1955
39 Tenn. App. 90 (Tenn. Ct. App. 1955)

noting that “if the cause of action had not accrued[, then] the suit was premature”

Summary of this case from Allen v. Fait

noting that “if the cause of action had not accrued[, then] the suit was premature”

Summary of this case from Pinnacle Bank v. Fid. & Deposit Co. of Md.
Case details for

Davidson County v. Beauchesne

Case Details

Full title:DAVIDSON COUNTY v. ALICE CROOK BEAUCHESNE

Court:Court of Appeals of Tennessee. Middle Section

Date published: Aug 2, 1955

Citations

39 Tenn. App. 90 (Tenn. Ct. App. 1955)
281 S.W.2d 266

Citing Cases

McGill v. Headrick

Battle v. Claiborne, (1915) 133 Tenn. 286, 180 S.W. 584. In the case of Davidson County v. Beauchesne, (1959)…

Pinnacle Bank v. Fid. & Deposit Co. of Md.

It bears mentioning-on a point that seems widely understood but rarely articulated-what it means to sue that…